background image

14

WPP 15 TE | Version 1.06

Maintenance and repairs

11.2.2 Visual inspection

11.2.3 Maintenance tasks

11.2.4 Recommended processing materials

11.2.5 Lubrication

Maintenance inter-
vals and operating 
hours

Maintenance point

Daily

Visual inspection of the hydraulic workshop press for dirt, clean if necessary

Weekly

Visual inspection of the hydraulic workshop press, in particular the press table and support 
bolts:

if necessary, replace damaged components or request repairs

Weekly

Visual inspection of the hydraulic workshop press, in particular the functions of the hydraulic 
components and checking for oil leaks (pump, hoses, cylinders, pressure gauge, etc.):

If necessary, replace damaged components

200

Functional inspection of the entire hydraulic workshop press to verify the machine com-
pletes all steps and operates correctly and safely: 

If necessary, request repairs

Annually

Have the hydraulic pipes and connections checked by an authorised person. In the event of 
increased usage periods, frequent or increased pressure pulses or severe external influ-
ences the machine must be checked once every six months.

If necessary, have damaged pipes replaced.

Maintenance inter-
vals and operating 
hours

Maintenance task

200

Lubricate the hydraulic workshop press (all moving parts, bearings and guides).

300

Change the hydraulic oil.

When necessary

Vent the hydraulic system.

When necessary

Top up hydraulic oil and then vent the hydraulic system.

6 years

Have hydraulic lines replaced. Every two years in the event of increased usage periods.

Processing material

Specification

Manufacturer/type

(non-binding recommenda-
tion)

Quantity

Hydraulic oil

ISO 32
Viscosity from 22 to 25 mm²/s

OMV HYDRAL 32

Grease

SO XM 2

OMV SIGNUM M 283

As required

Machine component

Lubrication point

Lubrication medium

Manual hydraulic pump

Stamp

Shaft on the switching valve

Grease: 

Apply grease to the listed components using a greased 
brush. 

Remove excess lubricant using a dry and lint-free cloth.

Summary of Contents for WPP 15 TE

Page 1: ...WPP 15 TE WPP 15 TE Operating Instructions Hydraulic workshop press WPP 15 TE...

Page 2: ...qualification 5 2 4 Personal protective equipment 5 2 5 Safety identifications on the workshop press 5 3 Intended use 6 3 1 Foreseeable misuse 6 3 2 Remaining risks 6 4 Technical data 6 4 1 Table 6 4...

Page 3: ...mit any information and experiences you make during application of the machine as these may be valuable for product improvements 1 3 Disclaimer All data in these operating instructions has been com pi...

Page 4: ...rating instructions they created meet current standards and adapt the op erating instructions where necessary Operators shall clearly manage and specify the re sponsibilities for installation operatio...

Page 5: ...f persons at work Staff must wear the personal protective equipment indicated in individual sections of these operating instructions when carrying out the different tasks on the machine The personal p...

Page 6: ...ess is ob served there is no actually foreseeable misuse that may cause hazardous situations involving personal injury 3 2 Remaining risks Even when observing all safety instructions operation of the...

Page 7: ...riveways ramps and the like are particularly dangerous If such passages are unavoidable special caution is required Before starting the transport check the transport route for possible danger points u...

Page 8: ...ne PE padding is made of polystyrene PS Dispose of these substances at a recycling centre or hand them over to the relevant waste disposal company Storage As a rule the hydraulic workshop press must b...

Page 9: ...ig 5 Installing crossbeam feet Step 1 secure the crossbeam feet and the two cross beams to both sides of the frame using the screws shims spring washers and nuts see Fig 5 Step 2 insert the support bo...

Page 10: ...s Step 3 Check all lines and connections are not leaking Check all machine parts are undamaged and op erate as intended 10 Operation WARNING Risk of death Non observance of these instructions causes a...

Page 11: ...1 For quick moving down the piston close both the valves 3 und 7 Fig 4 turn clockwise and move the pump lever Step 2 When the piston is positioned closed above the workpiece open valve 3 Fig 4 turn a...

Page 12: ...is over the workpiece Step 6 Align the workpiece and hydraulic cylinder Step 7 Open valve 3 and operate the hand pump to press the stamp onto the workpiece Monitor the pressure gauge display Step 8 Cl...

Page 13: ...e hydraulic pipes must be replaced after an operating period of six years In the event of increased usage peri ods and stricter requirements pipes must be replaced every two years 11 2 1 Oil changes D...

Page 14: ...he hydraulic pipes and connections checked by an authorised person In the event of increased usage periods frequent or increased pressure pulses or severe external influ ences the machine must be chec...

Page 15: ...required for queries or spare parts orders Device type Item number Spare parts drawing number Position number Year of manufacture Quantity Desired shipping type post freight sea air ex press Shipping...

Page 16: ...parts drawing The following drawing is intended to identify the required spare parts in the event of service If applicable submit a copy of the parts drawing including the highlighted components to yo...

Page 17: ...EC Declaration of Conformity WPP 15 TE Version 1 06 17 13 3 Hydraulic Circuit diagram Fig 10 Hydraulic circuit diagram of the WPP 15 TE...

Page 18: ...type plate complies with all relevant regulations of the aforementioned directive as well as any other applicable directives subse quently added including the changes applicable at the time the declar...

Page 19: ...s Visual inspection of press clean if necessary Visual inspection of press table and support bolt Grease workshop press Function test of press repair if necessary Change the hydraulic oil Vent the hyd...

Page 20: ...www unicraft de...

Reviews: