7
ELECTRICAL CONNECTIONS
GAS TRAIN INSTALLATION DIAGRAM
The diagram in Fig. 7 shows the components of the gas train which are included in the delivery and those which must be fitted
by the installer. The diagrams complies with regulations in force
Key
1
Burner
2
Manual shut-off valve
3
Bellow joint
4
Multibloc valves group
5
Leakage control device
z
Remove the burner cover.
z
Carry out the electrical connections to the power supply con-
nector as shown in Fig. 6.
z
Refit the burner cover.
Fig. 6
RESPECT THE BASIC SAFETY RULES. MAKE SURE OF THE CONNECTION TO THE EARTHING SYSTEM.
DO NOT REVERSE THE PHASE AND NEUTRAL CONNECTIONS. FIT A DIFFERENTIAL THERMAL
MAGNET SWITCH ADEQUATE FOR CONNECTION TO THE MAINS.
Fig. 7
Burners fitted with Multibloc DUNGS MB-
DLE... (2 pressure
pressure governor)
1
4
3
2
5
MANUFACTURER INSTALLER