C.I.B. UNIGAS - M039119CE
14
MOUNTINGS AND CONNECTIONS
Packing
urners are despatched in cardboard packages whose dimensions are: 1030mm x 530mm x 570mm (L x P x H)
Packing cases of this type are affected by humidity; the maximum number of cases to be stacked is showed outside the packing.
The following are placed in each packing case.
1
Burner with gas train;
1
gasket to be inserted between the burner and the boiler;
1
envelope containing this manual
When disposing of the burner packing and if the packing is scrapped follow the procedures laid down in the current legislation regarding
the disposal of materials.
Fitting the burner to the boiler
To install the burner into the boiler, proceed as follows:
1
make a hole on the closing door of the combustion chamber as described on paragraph “Overall dimensions”)
2
place the burner to the boiler: lift it up and handle it according to the procedure described on paragraph “Handling the burner”;
3
place the 4 stud bolts (5) on boiler’s door, according to the burner’s drilling template described on paragraph “Overall dimensions”;
4
fasten the 4 stud bolts;
5
place the gasket on the burner flange;
6
install the burner into the boiler;
7
fix the burner to the stud bolts, by means of the fixing nuts, according to the next picture.
8
After fitting the burner to the boiler, ensure that the gap between the blast tube and the refractory lining is sealed with appropriate
insulating material (ceramic fibre cord or refractory cement).
The burner is designed to work positioned according to the picture below. For different installations, please contact the Technical
Department.
Keys
1
Burner
2
Fixing nut
3
Washer
4
Sealing gasket
5
Stud bolt
7
Blast tube
SIDE UP
SIDE
DOWN