PART II: INSTALLATION
14
insulating material (ceramic fibre cord or refractory cement).
Matching the burner to the boiler
The burners described in this manual have been tested with combustion chambers that comply with EN676 regulation and whose
dimensions are described in the diagram . In case the burner must be coupled with boilers with a combustion chamber smaller in
diameter or shorter than those described in the diagram, please contact the supplier, to verify that a correct matching is possible, with
respect of the application involved. To correctly match the burner to the boiler verify the type of the blast tube . Verify the necessary
input and the pressure in combustion chamber are included in the burner performance curve; otherwise the choice of the burner must
be revised consulting the burner manufacturer. To choose the blast tube lenght follow the instructions of the boiler manufacturer. In
absence of these consider the following:
Cast-iron boilers, three pass flue boilers (with the first pass in the rear part): the blast tube must protrude no more than
Dist
= 100
mm into the combustion chamber. (please see the picture below)
Pressurised boilers with flame reversal: in this case the blast tube must penetrate
Dm
50 ÷ 100 mm into combustion chamber in
respect to the tube bundle plate.(please see the picture below)
The length of the blast tubes does not always allow this requirement to be met, and thus it may be necessary to use a suitably-sized
spacer to move the burner backwards or to design a blast tube tha suites the utilisation (please, contact the manifacturer).
WARNING! Carefully seal the free space between blast tube and the refractory lining with ceramic fibre rope or
other suitable means.
4
1
2
3 4
5
6
7
6
Keys
8
1
Burner
2
Fixing nut
3
Washer
4
Ceramic fibre plait
5
Stud bolt
7
Blast tube
Dist. = 100 mm
DM = 50 ÷ 100 mm
B
A
Dist.
DM
A
: ceramic fibre
B
: refractory wall
Summary of Contents for K890A
Page 45: ......
Page 46: ......
Page 47: ......
Page 49: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023 ...
Page 56: ...8 Parameters level heating engineer ...
Page 98: ...50 ERROR CODE TABLE ...
Page 99: ...51 ...
Page 100: ...52 ...
Page 101: ...53 ...
Page 102: ...54 ...
Page 103: ...55 ...
Page 104: ...56 ...
Page 105: ...57 ...
Page 106: ...58 ...
Page 107: ...59 ...
Page 108: ...60 ...
Page 109: ...61 ...
Page 110: ...62 ...
Page 111: ...63 ...
Page 112: ...64 ...
Page 117: ......
Page 118: ......
Page 119: ......
Page 121: ...WB1 QF B QF A ...
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ...QF A QF B ...
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......