C.I.B. UNIGAS - M039207CB
27
Electrical connections
To execute the electrical connections, proceed as follows:
1
remove the cover from the electrical board, unscrewing the fixing screws;
2
to execute the electrical connections see chapter “Electric wiring diagrams”;
3
check the direction of the fan motor (see next paragraph)
4
refit the panel cover.
To execute the electrical connections see the “ELECTRICAL WIRING DIAGRAMS”.
Rotation of fan motor and pump motor
Once the electrical connection of the burner is executed, remember to check the rotation of the motors. The motor should rotate accor-
ding to the indication on the body. In the event of wrong rotation, reverse the three-phase supply and check again the rotation of the
motor.
Oil thermostat adjustment
To find the thermostats, remove the cover of the burner switchboard. Adjust them using a screwdriver on the VR screw as shown in the
next picture.
NOTE:
thermostat
TCI
is provided on burners fired with fuel oil having a 50° E at 50° C viscosity only.
Respect the basic safety rules. make sure of the connection to the earthing system. do not reverse the phase and
neutral connections. fit a differential thermal magnet switch adequate for connection to the mains.
ATTENTION: before executing the electrical connections, pay attention to turn the plant’s switch to OFF and be
sure that the burner’s main switch is in 0 position (OFF) too. Read carefully the chapter “WARNINGS”, and the
“Electrical connections” section.
WARNING: The burner is provided with an electrical bridge between terminals 6 and 7; when connecting the high/
low flame thermostat, remove this bridge before connecting the thermostat.
IMPORTANT: Connecting electrical supply wires to the burner teminal block MA, be sure that the ground wire is
longer than phase and neutral ones.
Connecting the oil heating resistors
PUMP MOTOR CONNECTION
Connecting the fan motor
In case of star-delta start-up, connect all the 6 wires, according to the sequence shown in the “Electrical wiring diagrams” chapter. If the
start-up is performes by means of inverter, follow the instructions on the related manual.
TCN - Oil enabling thermostat (Fig. 18)
Adjust this thermostat to a value 10% lower than that showed in the
viscosity-temperature diagram (Fig. 12).
TRS - Resistor safety thermostat (Fig. 18)
The thermostat is set during factory testing at about 190° C.
This thermostat trips when the operating temperature exceeds the set
limit. Ascertain the cause of the malfunction and reset the thermostat
by means of the PR button.
TR - Resistor thermostat (Fig. 18)
Adjust this thermostat to the correct value according to the viscosity-
temperature diagram (Fig. 12) and check the temperature by using a
thermometer with a scale of up to 200° C mounted on the pre-heating
tank.
TCI - Installation enabling thermostat (Fig. 18)
This thermostat is fitted on burners fired with oil at a viscosity of 50° E
at 50° C only. Set the thermostat according to the data showed on
page 20.
Fig. 18
R1
230V
400 V
R1
R2
R2
R3
R3
R4
R4
R5
R5
R6
R6
L3
L3
L2
L2
L1
L1
18 - 24 kW
230V
400 V
W2
U2
V2
U1
V1
W1
W2
U2
V2
U1
V1
W1
L1
L2
L3
L1
L2
L3
VR
VR
VR
PR
Summary of Contents for KTP1030
Page 25: ...C I B UNIGAS M039207CB 25 Fig 17 Hydraulic diagram 3ID0014 Two or more burners configuration...
Page 46: ...C I B UNIGAS M039207CB 46...
Page 47: ...C I B UNIGAS M039207CB 47...
Page 48: ...C I B UNIGAS M039207CB 48...
Page 49: ...C I B UNIGAS M039207CB 49...
Page 50: ...C I B UNIGAS M039207CB 50 Pumping Unit Electric Wiring Diagrams...
Page 51: ...C I B UNIGAS M039207CB 51...
Page 52: ...C I B UNIGAS M039207CB 52...
Page 55: ...C I B UNIGAS M039207CB 55...
Page 59: ......
Page 74: ......
Page 83: ......
Page 84: ......
Page 85: ...RWF50 2x RWF50 3x User manual M12922CB Rel 1 0 07 2012...
Page 100: ...16 Note Specifications and data subject to change Errors and omissions excepted...
Page 101: ...KM3 Modulator USER MANUAL M12927CA Rel 1 0 10 2020...
Page 102: ...M12927CA MOUNTING 2...
Page 118: ...1 RWF55 5X RWF55 6X User manual M12926CA Rel 0 1 10 2015...
Page 119: ...2 DEVICE INSTALLATION Fixing system Drilling dimensions...
Page 140: ......
Page 141: ...23 Note Specifications and data subject to change Errors and omissions excepted...