PART II: INSTALLATION
27
Integrated proving system (burners equipped with LME7x, LMV, LDU)
ATTENTION: it is reccomended to install the filter with gas flow parallel to the floor in order to prevent dust fall on
the safety valve during maintenance operation.
This paragraph describes the integrated proving system operation sequence:
At the beginning both the valves (EV1 and EV2) must be closed.
Test space evacuating: EV2 valve (burner side) opens and keep this position for a preset
time (td4), in order the bring the test space to ambient pressure.Test atmospheric pressure:
EV2 closes and keep this position for a preset time (test time td1). The pressure switch
PGCP has not to detect a rise of pressure.
Test space filling: EV1 opens and keep this position for a preset time (td3), in order to fill the
test space.
Test gas pressure: EV1 closes and keep this position for a preset time (td2). The pressure
switch PGCP has not to detect a pressure drop down.
If all of the test phases are passed the proving system test is successful, if not a burner lockout
happens.
On LMV5x and LMV2x/3x and LME73 (except LME73.831BC), the valve proving can be
parameterized to take place on startup, shutdown, or both.
On LME73.831BC the valve proving is parameterized to take place on startup only.
PS
EV1
EV2
/
EV2
EV1
PGCP
Summary of Contents for P75R
Page 53: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 60: ...8 Parameters level heating engineer...
Page 102: ...50 ERROR CODE TABLE...
Page 103: ...51...
Page 104: ...52...
Page 105: ...53...
Page 106: ...54...
Page 107: ...55...
Page 108: ...56...
Page 109: ...57...
Page 110: ...58...
Page 111: ...59...
Page 112: ...60...
Page 113: ...61...
Page 114: ...62...
Page 115: ...63...
Page 116: ...64...
Page 121: ......
Page 122: ......
Page 123: ......
Page 125: ...IG FU B...
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......