PART II: INSTALLATION
28
ELECTRICAL CONNECTIONS
To execute the electrical connections, proceed as follows:
1
remove the cover from the electrical board, unscrewing the fixing screws;
2
execute the electrical connections to the supply terminal board as shown in the attached wiring diagrams;
3
check the direction of the fan motor (see next paragraph);
4
refit the panel cover.
Rotation of electric motor
Once the electrical connection of the burner is executed, remember to check the rotation of the electric motor. The motor should rotate
according to the “arrow” symbol on the body. In the event of wrong rotation, reverse the three-phase supply and check again the rota-
tion of the motor.
NOTE: the burners are supplied for three-phase 380 V or 400 V supply, and in the case of three-phase 220 V or 230 V supply it
is necessary to modify the electrical connections into the terminal box of the electric motor and replace the overload tripped
relay.
Note on elecrtical supply
In the case where the power supply of the AUXILIARIES of the phase-phase burner (without a neutral), for the flame detection it is
necessary to connect the RC circuit Siemens between the terminal 2 (terminal X3-04-4 in case of LMV2x, LMV3x, LMV5x, LME7x) of
the base and the earth terminal, RC466890660. For LMV5 control box, please refer to the clabeling recommendations avaible on the
Siemens CD attached to the burner.
WARNING! Respect the basic safety rules. make sure of the connection to the earthing system. do not reverse
the phase and neutral connections. fit a differential thermal magnet switch adequate for connection to the mains.
WARNING! before executing the electrical connections, pay attention to turn the plant’s switch to OFF and be
sure that the burner’s main switch is in 0 position (OFF) too. Read carefully the chapter “WARNINGS”, and the
“Electrical connections” section.
ATTENTION: Connecting electrical supply wires to the burner teminal block MA, be sure that the ground wire is
longer than phase and neutral ones.
WARNING: (only for double stage and progressive burners) The burner is provided with an electrical bridge
between terminals 6 and 7; when connecting the high/low flame thermostat, remove this bridge before connecting
the thermostat.
CAUTION: check the motor thermal cut-out adjustment
Key
C - Capacitor (22nF/250V)
LME / LMV - Siemens control box
R - Resistor (1M
Ω
)
M - Terminal 2 (LGB,LMC,LME), terminal X3-04-4 ( LMV2x,
LMV3x, LMV5, LME7x)
RC466890660 - RC Siemens filter
LMV2/3.. - LMV5..
M
Summary of Contents for P75R
Page 53: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 60: ...8 Parameters level heating engineer...
Page 102: ...50 ERROR CODE TABLE...
Page 103: ...51...
Page 104: ...52...
Page 105: ...53...
Page 106: ...54...
Page 107: ...55...
Page 108: ...56...
Page 109: ...57...
Page 110: ...58...
Page 111: ...59...
Page 112: ...60...
Page 113: ...61...
Page 114: ...62...
Page 115: ...63...
Page 116: ...64...
Page 121: ......
Page 122: ......
Page 123: ......
Page 125: ...IG FU B...
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......