ELECTRICAL WIRING DIAGRAMS
Electric supply connections must be arranged in order to ensure the burner stops if IRxx switcesh are open. When the three phase power supply is interrupted, the auxiliary (single phase) power supply must be interrupted
as well.
WARNING:
1 - Power supply 400V 50Hz 3N AC with neutral
2 - Don’t reverse phase with neutral
3 - Ensure the burner is properly earthed