C.I.B. UNIGAS
- M039144CD
11
The pilot gas train is already installed into the burner, the connection from the filter with stabiliser to the gas supply network must be
carried out.
Once the gas train in installed, execute the electrical connections for all its items (gas valves group, pressure switch).
ATTENTION:
once the gas train is mounted according to the diagram on Fig. 4, the gas proving test mus be performed,
according to the procedure set by the laws in force.
connection to the gas supply network