8
INSTALLING THE BURNER
Packing
Burners are despatched in wooden crates whose dimensions are:
RN510-515-520:
1720 x 1500 x 1210 (L x P x H)
RN525:
1800 x 1500 x 1300 (L x P x H)
Packing cases of this kind are affected by humidity and are not suitable for stacking. The following are placed in each packing case:
burner;
gasket to be inserted between the burner and the boiler;
oil flexible hoses;
oil filter;
envelope containing this manual.
RN515-520-525:
as far as these burners, the oil pumping/pre-heating unit is separate.
To get rid of the burner’s packing, follow the procedures laid down by current laws on disposal of materials.
Handling the burner
The burner is mounted on a stirrup provided for handling the burner by means of a fork lift truck: the forks must be inserted into the A
anb B ways. Remove the stirrup only once the burner is installed to the boiler.
Fitting the burner to the boiler
To install the burner into the boiler, proceed as follows:
1
make a hole on the closing door of the combustion chamber as described on paragraph “Overall dimensions”)
2
place the burner to the boiler: lift it up and handle it according to the procedure described on paragraph “Handling the burner”;
3
place the stud bolts (5) on boiler’s door, according to the burner drilling template described on paragraph “Overall dimensions”;
4
fasten the stud bolts;
5
place the gasket on the burner flange;
6
install the burner into the boiler;
7
fix the burner to the stud bolts, by means of the fixing nuts, according to the next picture.
8
After fitting the burner to the boiler, ensure that the gap between the blast tube and the refractory lining is sealed with appropriate
insulating material (ceramic fibre cord or refractory cement).
ATTENTION! The handling operations must be carried out by specialised and trained personnel. If these operations
are not carried out correctly, the residual risk for the burner to overturn and fall down still persists.
To move the burner, use means suitable to support its weight (see paragraph “Technical specifications”).
The unpacked burner must be lifted and moved only by means of a fork lift truck.
A
B
1
2
3 4
5
6
7
6
Keys
9
1
Burner
2
Fixing nut
3
Washer
4
Ceramic fibre plait
5
Stud bolt
Blast tube
Summary of Contents for RN510
Page 39: ......
Page 54: ......
Page 63: ......
Page 64: ......
Page 65: ...RWF50 2x RWF50 3x User manual M12922CB Rel 1 0 07 2012...
Page 80: ...16 Note Specifications and data subject to change Errors and omissions excepted...
Page 81: ...KM3 Modulator USER MANUAL M12927CA Rel 1 0 10 2020...
Page 82: ...M12927CA MOUNTING 2...
Page 98: ...1 RWF55 5X RWF55 6X User manual M12926CA Rel 0 1 10 2015...
Page 99: ...2 DEVICE INSTALLATION Fixing system Drilling dimensions...
Page 120: ......
Page 121: ...23 Note Specifications and data subject to change Errors and omissions excepted...
Page 130: ...OFF...
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......