31
OPERATION
N.B. be sure the cutoff valves on the delivery and return pipes are OPEN.
z
Turn the burner on by means of its main switch
A
(see next pictures).
z
Check that the burner is not locked (LED
E
lights up); if so, reset it by pressing the reset button
N
.
z
Check that the series of thermostats (or pressure switches) enable the burner to start up.
z
At the beginning of the start-up cycle the servo control drives the air damper to the maximum opening, the fan motor starts and the
pre-purge phase begins. During the pre-purge phase the complete opening of the air damper is signalled by the indicator light F on
the front panel.
z
At the end of the pre-purge the ignition transformer is energised (signalled by the indicator light C on the panel). Two seconds later,
the oil valve opens and the ignition transformer is de-energized (light C off).
The burner is now into operation, the servocontrol begins the opening, after few seconds the burner goes to two stages operation and
eventually switches to the high flame operation, depending on the needs of the plant (light A, on) or continues with low flame operation
(light B, on).
As far as fully-modulating burners, see the Siemens RWF40 burner modulator manual.
ATTENTION: before starting the burner up, be sure that the manual cutoff valves are open and check that the pres-
sure upstream the gas train complies the value quoted on paragraph “Technical specifications”.