PART II: INSTALLATION
17
DUNGS MBE
Components and position of pressure switches
PS pressure sensor connection to VD-R actuator and gas train
Pressure taps
MultiBloc MBE
Attention: In the case of the MBE... valve, a pressure limit switch downstream of the safety valve is mandatory.
1
PGMIN minimum gas pressure switch
2
PGMIN minimum gas pressure switch (alternative
to 1)
3
PGCP leakage control gas pressure switch
4
PGMAX maximum gas pressure switch
5
Actuator with integrated pressure stabiliser
6
On-Off actuator
7
Valve body (Threaded)
8
Valve body (Flange)
On equipment versions Facile VD-R
must be installed upstream valve
3
5
1
2
4
6
8
VD-R
VD-V
3
5
1
2
4
6
7
VD-R
VD-V
min. 5 Ø
Ø
VD-R
VD-V
PS
1, 2, 3, 4
Sealing plug
G1/8 ISO 228
5
Locking screw
For version VB-2L only:
connection for vent line
NPT 1
1, 2, 3, 5
Sealing plug
G1/8 ISO 228
4
G3/4 for system
accessories
6, 7
Sealing plug G1/4
ISO 228
8
For version VB…L
only: connection for
vent line
VB-2½L=1¼"NPT
VB-3L=1½"NPT
VB-4L=2"NPT
VB-5L=2"NPT
Summary of Contents for RX1025.1
Page 41: ......
Page 42: ......
Page 43: ......
Page 45: ...User manual Siemens LMV 5x M12914CA Rev 0 03 2008...
Page 46: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 62: ...Annex1 Example for motor cable...
Page 63: ......
Page 64: ...Annex 2 Example for sensor cable...
Page 65: ......
Page 66: ......
Page 70: ......