CIB UNIGAS - M039168CC
15
Key
Gas train - 3
: Gas train with valves group VGD 20/40 with built-in gas pressure go PGCP
Gas train 4
(DN65/80/100): Gas train with valves group MBC 1900/3100/5000SE (2 gas pressure go
pressure switch) + PGCP
1
Burner
2
Butterfly valve
4
Maximum gas pressure switch (optional)
5
Minimum gas pressure switch
6
Gas filter
7
Bellow joint
8
Manual cutoff valve
11
VGD Valves group
14
Pressure governor with filter
15
Pilot gas valve
16
PGCP (leakage control pressure switch)
19
MBC Valves group (DN65/80/100)
1
2
4
5
6
7
8
11
16
15
15
4
7
8
14
MANUFACTURER
INSTALLER
1
2
3
4
5
7
8
15
15
4
7
8
14
6
19
16
MANUFACTURER
INSTALLER