Chapter 2 Installation and Wiring
6
Chapter 2 Installation and Wiring
2.1 Out-of-Box Inspection
Check whether the packages are damaged. If the packages are intact, check the main
components against the shipping list. If any inconsistency is found, contact us in time.
e main components include cabinets, signal cable, power cable, USB cable, DVI cable,
and sending box. For details about the components, refer to the shipping list.
2.2 General Installation
2.2.1 Installation of Fixed Front-maintenance Cabinet
1) Adjust all ground beams to the same level by using a horizontal ruler.
2) Remove the modules at four corners of each cabinet (refer to Section 6.2.2).
Install the cabinets sequentially from bottom to top and from middle to both sides.
Secure the connecting plates and cabinets with installation screws to the square
tubes.
3) Keep proper joints and flatness between the cabinets during cabinet installation.
Summary of Contents for Uslim-O Series
Page 1: ......
Page 2: ......
Page 10: ......
Page 80: ...Chapter 6 Troubleshooting and Component Replacement 70...
Page 90: ...Contact Information 80...
Page 91: ......
Page 92: ......