15. Blow off or vacuum the PCR cleaning roller.
Install in the waste hopper.
16. Place a small amount of conductive grease in the holders
and install the PCR.
17. The large gear side of the drum axle shaft has conductive
grease on it. Regardless of whether you are replacing the drum
or not, clean the old grease off and replace with new.
18. Install the drum and axle from the small gear side of the
drum into the waste hopper. Make sure the keyed end of the
shaft is on the large gear side.
XEROX WORKCENTRE 3210
•
3220 TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS
© 2011 UniNet Imaging Inc. All trademark names and artwork are property of their respective owners. Product brand names mentioned are intended to show compatibility only.
UniNet Imaging does not warrant downloaded information. Unauthorized sale, reproduction or distribution of this article is prohibited. For additional support, please contact techsupport@uninetimaging.com
www.
uninet
imaging.com