5.
Make sure all the battery fuses in external battery cabinets are
open.
6.
Bypass fuses F2 on all UPS-passive modules are inserted.
7.
Check the Position of the DIP Switches SW1-9. This is a
Single- Cabinet Configuration, and the DIP Switches SW1-9
must be set according to positions shown in paragraph 4.2.6.
4.5.2 Start-Up
1.
Insert fuses for the supply of UPS-System in the Input
Distribution Board.
The LED-indicators “LINE 1” and “Battery” on UPS modulses
are lit green.
On LCD-Display “LOAD OFF, SUPPLY FAILURE” will
appear.
2.
UPS Module 1:
Press both “ON/OFF” Main Buttons to switch on UPS. On
LCD: “LOAD DISCONNECTED PARALLEL SWITCH
OPEN” will appear and the LED-indicator will indicate as
shown below:
3.
Via Control Panel, Select: LOAD TO INVERTER
LED-indicator will indicate as shown below:
4.
Scroll through the Measurement menu and check values.
5.
Modules 2 - 5:
Repeat Steps 2-4 for each module.
6.
Check battery polarity and voltage.
7.
If the battery polarity and voltage is correct insert external
battery fuses (breakers).
LED Indicator
Colour
LINE 1
Green
LINE 2
Green
BYPASS
Green
INVERTER
OFF
BATTERY
Flashing Green
LED Indicator
Colour
LINE 1
Green
LINE 2
Green
BYPASS
OFF
INVERTER
Green
BATTERY
Flashing Green