MDP-15
6. Operation
The drill chips and dust will spread in the air when grinding.
Therefore, please where a dustproof mask or set dustproofing device.
Moreover, please ventilate the air in the grinding room every 2 hours periodically.
6-1. Machine Installation
1) Initial set up (Refer to 6-2)
2) Turn the power switch (15) on the right side of the main frame on.
SOURCE lamp is illuminated.
3) Push the motor button (22). The button should now be illuminated and the wheels should
also be rotating.
4) Pointing process (Refer to 6-3)
5) Select the appropriate mode with the mode change switch (23).
6) Set the table speed adjustment dial (20).
7) Insert the drill
into the collet.
8) Control grinding amount (Refer to Fig.1).
9) Level positioning (Refer to Fig.1).
10) Press the Start button (33). The button should
now
be
illuminated.
11) When the pointing cycle is finished, the start button should no
longer be illuminated.
Position in cross hair
before pointing
After pointing
[Fig.1]
[Fig.2]
6-2. Initial Set up –1
1) Setting the primary face angle.
Locate and loosen the 2 allen bolts on the motor housing which hold the motor housing in
place. Next rotate the motor housing adjustment screws counterclockwise until the desired
angle is achieved Then retighten them.
2) Setting the point angle
Align the quill assembly attachment plate to the appropriate angle
on the MDP-15 table.
180
°
- point angle
=
2
3) Drill well installation.
Select the drill well that corresponds with the drill diameter to be pointed.
UNION TOOL
9
Desired point angle
Grinding amount