| 22
C64.65201 Issue 3
Jun 2019
Slide the collar into positon and secure it to the spigot through the GRP post using
the grub screws tightened to 40 Nm.
Ensure the Lower Backboard Extension is fitted in its operational position. This is
covered in the Backboard Arrangement section below.
The installation is now exactly the same as the procedure followed for a GRP Head
and Post installed in an Assisted Lift Trunnion, as shown in the ALT Operations and
Maintenance Manual C64.65976 which is available on the Unipart Dorman website.
Where the head is mounted on the Unipart Dorman GRP post installed in an ALT, the
alignment and all adjustment is done from ground level as the head is fixed in the
bracket with no adjustment facility.