Aspiro 1U in 2U Enclosure Quick Install Guide - 5
© 2017 UNIPOWER LLC
This document is believed to be correct at time of publication and UNIPOWER LLC accepts no responsibility for consequences from printing errors or inaccuracies. All specifications subject to change without notice.
Technical Support
For more complete information relating to installation
and operation of this system please read the Instruction
Manual which can be downloaded from the UNIPOWER
web site at:
http://www.unipowerco.com/pdf/PM110-6500-00-D1.pdf
For additional technical support or feedback, please visit
where you will find the
phone number for your region.
Alternatively, email:
technical.support@unipowerco.com
9 Commissioning Procedure
1. Remove the alarm cover and check that
all connections are made according to the
installation drawing. Verify that all connections
are properly tightened with sufficient torque.
2. Ensure that load and battery MCB breakers are
set to OFF position - ensuring the load and battery
strings are connected.
3. Ensure that all rectifier modules are removed. If
not, remove each one in turn starting from the
rightmost position.
4. Check the battery polarity with the multimeter
at the SB-50 connector. Place the positive lead of
the meter to the positive contact and the negative
lead to the battery contact. The meter must now
show a positive voltage. If the voltage is negative,
change over the connection of the gray and black
battery cables to the batteries.
5. Plug in the AC power cord.
6. Plug in the rectifier modules, starting from the left
most position. Make sure to fasten the rectifiers
again. The rectifiers will turn on automatically.
Empty rectifier positions must be cover with
rectifier blanks.
7. Set all load breakers into the “1” (ON) position.
8. The green LED on the controller should blink for
approximately 20 sec.
9. The output voltage will increase slowly to U1 (float
charge voltage).
10. Turn the battery breaker to the “1” (ON) position.
11. If any alarms are present, they should be reset in
accordance with the procedure for the installed
controller, ACC Extended (ACX) or PCC.
12. The system should now be without alarms.
13. Attach all the system covers in their correct places.
14. Check that all changes to drawings, if any, have
been completed.
15. Clean the site.
16. Fill in the commissioning record (table 5-2 in
section 5.8 in the instruction manual).
10 EMC Considerations
This equipment has been tested and found to comply
with the limits for a Class B digital device, pursuant
to part 15 of the FCC Rules. Please see the
, section 3.1.8, for more details.
11 PowCom Login
NOTE:
Remote access using PowCom software is only
available when a controller is installed.
If you don’t have PowCom software you can
download it from the UNIPOWER web site at:
www.unipowerco.com/powcom/PowCom_setup.zip
Once you have downloaded the file, you will need a
license number to activate the software. This can be
found in the readme.txt file in the installation package.
To activate your PowCom software with your license,
please follow the instructions below.
1. Start PowCom and go to Communication/Properties
in the menu.
2. Click on the license tab in the Properties window.
Copy and paste your license number and click on
the Activate License button.
Please exit the program and restart it again in order to
fully activate the license.
If any problem occurs do not hesitate to contact our
technical support.
The PowCom user manual is available from the
UNIPOWER web site at: