8
4210 Series (Daisy Chain Operation)
Fluid ports can be daisy chained together, but
performance will vary depending on how many nozzles
are in the chain, the length of the tubing between
nozzles, and how many nozzles are spraying at the
same time. Tubing should be kept as short as possible
for best response time and performance.
1. Connect clear nylon tubing between a pressurized
fluid supply and the
LIQUID
port of the first nozzle in
the chain.
2. Insert the fluid supply tubing into output side of tee
on the first nozzle, route the tubing, and insert it into the
input side of second nozzle’s tee. Repeat this for each
nozzle in the chain.
3. At the last nozzle in the chain (this has an elbow for
the
LIQUID
input and not a tee), attach the fluid tubing
into the elbow.
4. Connect black nylon tubing between the outlet of each
valve to the
AIR
port of each nozzle.
5. Connect compressed air to the regulator on the inlet of
the valve stack.
Installation
Pressurized fluid supply
Compressed air
1
5
4
Solenoid
valve bank
2
3
Fully Assembled
Figure 20: 4210 Series (daisy chain operation)
Use an elbow at the end
of the daisy chain
Use a tee for the
beginning and middle
of the daisy chain
Summary of Contents for 4210 Series
Page 1: ...Low Volume Spray Nozzles Operation Manual...
Page 6: ...Identifying Symbols Caution ISO 7000 0434B...
Page 8: ......
Page 33: ...25 Notes...