background image

Page: 10

 Version  : 11-04-016

Working through the aperture in the base of the cover, support the waste assembly, fit the nut 

and seals from the P trap through the front hole in the cover and then connect to the P trap 

Connect the P Trap to the underside of the basin.

Fit the free end of the flexible hose to the waste pipe fitted to the site as part of the pre 

installation preparations and secure with a cable tie as shown in the picture on page 5.

Rod
Adjuster

Basin viewed from below

Rod
Adjuster

Basin viewed from below

 Adjustments to the screw on the pop-up waste plug 

base and clamp for the rods may be necessary to ensure  maximum lift of the waste plug. Access 

to the clamp may be gained through the large hole in the base of the white plastic lower cover

Fit the Trunking: 

The hot and cold supply hoses need to be enclosed 

within the white self adhesive trunking supplied.

 Using the handset, raise the assembly to its highest 

position

Remove the capping from the front of the trunking.

Remove the protective film from the self adhesive tape 

fitted to the rear of the trunking.

Pass the trunking behind the hot and cold supply hoses 

taking care to ensure that the self adhesive tape is kept 

away from the wall at this time. The top of the trunking 

needs to be aligned with the recess in the bottom left 

hand side of the rise and fall unit; through which were 

passed the supply hoses earlier.

Using a level, ensure the 

trunking is vertical. Once 

aligned, press the self adhesive 

tape against the wall to secure 

the top of the trunking. Then 

press the entire length of the 

trunking into position.

Fit the capping. 

Fit the mirror:

Remove the two white plastic 

caps from above the top mirror 

clips and remove the screws.

Place the bottom edge of the mirror into the lower catches and hold 

in a vertical position. Ensure the mirror is fitted centrally. Gently push the uppermost catches 

downwards into position such that they retain the mirror in its correct position. 

Fit the 2 

security scews .

Test the unit:

Operate the handset to raise and lower the basin over the full range of travel to ensure there 

is clearance between all moving surfaces. Examine for evidence of leaks correct as necessary, 

examine and clean the assembly. Complete  the warranty documentation and pass the completed 

warranty document to the client.

Summary of Contents for ABW6

Page 1: ...USER GUIDE ABW6 Height Adjustable Washbasin OpeMed United Care Ltd www united care com 44 0 1252 758 858 infouk united care com ...

Page 2: ... basin Press and hold button to lower basin Press and release button to turn Hot water on or off Press and release button to turn Cold water on or off Press and release button to raise or lower plug Press and release button to turn light on or off Following functions apply to the SP version only ...

Page 3: ...must not be used i e drain cleaners acetone oven cleaners or acids The rise and fall unit mirror and handset should be cleaned using a warm soapy solution and rinsed with a damp cloth Attention should always be paid to instruction labels on the outside of cleaning agent containers Manual operation of the lever tap system In normal operation the levers should be facing forward towards the user when...

Page 4: ... 0003 Holder handset 1 7 20 040 50 0006 Handset ABW6 grey 6 button 1 8 10 041 00 0021 Tube copper 70mm ABW6sp 2 9 10 041 00 0020 Tube copper 45mm ABW6sp 6 10 21 090 00 0390 Tie cable 12 300mm 1 11 20 041 90 0001 Hose kit 2pr 300x550mm 1 2 flat 15mm brass tube ABW6sp 1 12 10 041 30 0002 Plug actuator assembly 1 13 20 040 30 0008 Connector 15mm 1 2 in brass 303 SF 2 14 20 040 30 0009 Connector 15mm ...

Page 5: ...equired with flush mounted a flex outlet cover on the wall behind the unit at a height of 1100mm from the floor on the centreline of the unit Fixing The basin assembly should be fixed to a load bearing wall i e strong enough to carry a 100kg load on wall fixing which is flat and free from obstruction from 200mm 2200mm above the floor If the basin needs to be fixed to a stud wall the wall will need specia...

Page 6: ...e fixings Ensure that the rail is level using a spirit level adjust to suit and check that it is secure With assistance place the rise and fall unit onto the wall ensuring that the two short rails welded to the unit engage with the one on the wall Ensure that the unit is level then mark the wall through the remaining three attachment points two on the lower horizontal beam and one on the upper hor...

Page 7: ...and place the up turned basin on the arms Fit the tap bodies to the basin as shown Ensure there is 35mm of threaded body showing above the basin deck to allow fitting the handle Ensure the nylon washer is fitted under the handle screw to remove any clearance on the spline Fit the 1 2 15mm tap adaptors Fit the spout in position and connect the flexible hoses as shown Fit the overflow hose and waste...

Page 8: ...Page Version 2 11 04 2016 30mm 50MM HOT INLET COLD INLET SPOUT into BASIN Pipe connection diagram Sloenoid Sloenoid Tap body Tap body ...

Page 9: ...he basin is under the white plastic upper cover which holds the mirror COLD SUPPLY HOT SUPPLY Hoses Rear view The mains water supply can now be fitted Ensure both the hot and cold mains water supplies have been flushed and only then fit the open ends of the supply hoses with the filter screens supplied onto the isolation valves Ensure the free end of the supply hoses are passed through the recess ...

Page 10: ... to the rear of the trunking Pass the trunking behind the hot and cold supply hoses taking care to ensure that the self adhesive tape is kept away from the wall at this time The top of the trunking needs to be aligned with the recess in the bottom left hand side of the rise and fall unit through which were passed the supply hoses earlier Using a level ensure the trunking is vertical Once aligned p...

Page 11: ...t as necessary and ensure that mains voltage is fully reconnected then press the reset button situated next to the handset connector If the light fails to illuminate further assistance will be required Fault The rise and fall unit travels upwards but not downwards Cause There is an obstruction underneath the basin or the microswitch is not engaged Remedy Depress the Up button on the handset to gai...

Page 12: ...ngdom United Care manufactures and installs high quality ceiling hoists and patient handling equipment for the hospital nursing home and domestic environment USER GUIDE ABW6 Height Adjustable Washbasin OpeMed United Care Ltd www united care com 44 0 1252 758 858 infouk united care com ...

Reviews: