6
VENT TERMINATION CLEARANCES
A.
Minimum 4-foot (1.22m) clearance below or
beside any door or window that opens.
B.
Minimum 1-foot (0.3m) clearance above any
door or window that opens.
C.
Minimum 3-foot (0.91m) clearance from any
adjacent building.
D.
Minimum 7-foot (2.13m) clearance from any
grade when adjacent to public walkways.
E.
Minimum 2-foot (0.61m) clearance above any
grass, plants, or other combustible materials.
F.
Minimum 3-foot (0.91m) clearance from an
forced air intake of any appliance.
G. Minimum 2-foot (0.61m) clearance below eves
or overhang.
H.
Minimum 1-foot (0.3m) clearance horizontally
from combustible wall.
I.
Must be a minimum of 3 foot (0.091m) above
the roof and 2 foot (0.61m) above the highest
point or the roof within 10 feet (3.05m).
G
Assembly Instructions
Step 1
Pull the factory installed wires out
of the top of the stove. There will
be two wire harnesses, as shown.
Step 2
Unpack the top mount controls and
ensure that the wiring harness shown
is attached securely.
Step 3
Connect the factory installed
wiring harnesses to the control
panel as shown.
Step 4
Attach the control panel to the top of the stove, as shown.
Step 5
Secure with two sheet metal screws.