Project # 22-753 Model: KP5522
Page | 15
Sampling Methods
ASTM E2515 was used in collecting particulate samples. The dilution tunnel is 12 inches
in diameter. All sampling conditions per ASTM E2515 were followed. No alternate
procedures were used.
Analytical Methods Description
All sample recovery and analysis procedures followed ASTM E2515 procedures. At the
end of each test run, filters, O-Rings and probes were removed from their housings,
dessicated for a minimum of 24 hours, and then weighed at 6 hour intervals to a
constant weight per ASTM E2515-11 Section 10.
Calibration, Quality Control and Assurances
Calibration procedures and results were conducted per EPA Method 28R, ASTM E2515-
11 and ASTM E2780-10. Test method quality control procedures (leak checks, volume
meter checks, stratification checks, proportionality results) followed the procedures
outlined.
Appliance Sealing and Storage
Upon completion of testing, the appliance was secured with metal strapping and the seal
below was applied, the appliance was then returned to the manufacturer’s location at:
227 Industrial Park Road, South Pittsburg, TN 37380 for archival.
Sealing Label
Summary of Contents for KP5522
Page 11: ...Project 22 753 Model KP5522 Page 10 Appliance Front Appliance Left...
Page 12: ...Project 22 753 Model KP5522 Page 11 Appliance Right Appliance Rear...
Page 14: ...Project 22 753 Model KP5522 Page 13 Pellet Fuel Analysis...
Page 17: ...Project 22 753 Model KP5522 Page 16 Sealed Unit...
Page 54: ......
Page 55: ......
Page 56: ......
Page 58: ...Project 22 751 Model Charnwood Skye E700 Page 16 Tunnel Schematic...
Page 102: ......
Page 103: ......
Page 104: ......
Page 129: ...2022 United States Stove Company 25 NOTES...
Page 177: ...2022 United States Stove Company 25 NOTES...
Page 272: ...24 2022 United States Stove Company NOTES...
Page 308: ......
Page 309: ......
Page 311: ......
Page 312: ......
Page 318: ......
Page 319: ......