Run 1.xlsm
Client:
Job #:
Model:
Tracking #:
Run #:
Technician:
Date:
High Burn End Time (min):
60
Medium Burn End Time (min):
180
Pre-Test Post Test
Avg.
Total Sampling Time (min):
360
30.47
30.47 30.47
Recording Interval (min):
1
26.2
23.4
0
0
0.994 (A)
10.0
10.0
1.002 (B)
56.857 ft
3
0.997 (Ambient)
0
(A)
0.000 cfm @
5 in. Hg
100%
(B)
0.001 cfm @
5 in. Hg
2/17/2022
(C)
0.000 cfm @
5 in. Hg
(Ambient)
0.002 cfm @
5 in. Hg
Point
dP (in H
2
O) Temp (
°
F)
2.00 percent
1
0.012
68
12 inches
2
0.018
68
0.99 [unitless]
3
0.019
68
29.00 lb/lb-mole
4
0.024
68
28.78 lb/lb-mole
5
0.022
68
0.7854 ft
2
6
0.017
68
7
0.016
68
V
strav
:
8.933 ft/sec
8
0.018
68
V
scent
:
11.375 ft/sec
9
0.022
68
F
p
:
0.785 [ratio]
10
0.022
68
Initial Tunnel Flow:
420.1 scf/min
11
0.020
68
12
0.014
68
Center
0.030
68
Static Pressure:
-0.043 in. H
2
O
Fuel Type:
D. Fir
Oak
Pellet Brand:
HHV (kJ/kg)
19,810
19,887
Pellet Fuel Grade:
%C
48.73
50
HHV (BTU/lb)
%H
6.87
6.6
%C
%O
43.9
42.9
%H
%Ash
0.5
0.5
%O
44.3
%Ash
MC (%WB)
Ambient Sample Volume:
Pitot Tube Cp:
Dilution Tunnel MW(dry):
Dilution Tunnel MW(wet):
PFI Premium
Lignetics
Tunnel Area:
TEST FUEL PROPERTIES
Default Fuel Values
Smoke Capture Check (%):
Date Flue Pipe Last Cleaned:
DILUTION TUNNEL FLOW
Traverse Data
Dilution Tunnel H
2
O:
Tunnel Diameter:
Meter Box γ Factor:
Meter Box γ Factor:
Induced Draft Check (in. H
2
O):
Sample Train Post-Test Leak Checks
Meter Box γ Factor:
Scale Audit (lbs)
Barometric Pressure (in. Hg)
1
SJB
Test Start Time: 9:35
2/18/2022
Relative Humidity (%)
Room Air Velocity (ft/min)
DILUTION TUNNEL & MISC. DATA - ASTM E2779 / E2515
USSC
22-753
KP5522
121
8449
Actual Fuel Used Properties
4.19
46.54
8.59
0.57
PFS-TECO
Page 7 of 32
Summary of Contents for KP5522
Page 11: ...Project 22 753 Model KP5522 Page 10 Appliance Front Appliance Left...
Page 12: ...Project 22 753 Model KP5522 Page 11 Appliance Right Appliance Rear...
Page 14: ...Project 22 753 Model KP5522 Page 13 Pellet Fuel Analysis...
Page 17: ...Project 22 753 Model KP5522 Page 16 Sealed Unit...
Page 54: ......
Page 55: ......
Page 56: ......
Page 58: ...Project 22 751 Model Charnwood Skye E700 Page 16 Tunnel Schematic...
Page 102: ......
Page 103: ......
Page 104: ......
Page 129: ...2022 United States Stove Company 25 NOTES...
Page 177: ...2022 United States Stove Company 25 NOTES...
Page 272: ...24 2022 United States Stove Company NOTES...
Page 308: ......
Page 309: ......
Page 311: ......
Page 312: ......
Page 318: ......
Page 319: ......