10
Accessory Installation
THERMODISC
THERMODISC
COVER
4” ELECTRICAL
JUNCTION BOX
BLOWERS
BLOWERS GASKET
CLIP NUTS
(Not used in the upper center hole)
ASSEMBLY OF FURNACE
Your furnace requires the following items to be
assembled or installed by the service person:
Blowers and Blower Controls
Electrical Connections
1.
Remove all parts from inside the furnace and
inspect for damage, including the firebrick as
some breakage could occur during shipment.
2.
Install the thermodisc on rear of furnace
cabinet with the two screws provided. Mount
the conduit assembly from the junction box to
the thermostat bracket. Crimp the two female
terminals to each of the wire leads. Plug the
wires to the thermodisc. NOTE: It does not matter
which of the two wires plugs to which terminal
on the thermodisc.
3. Remove blowers from cartons. Remove junction
box cover. Attach clip nuts as in figure shown.
Install blower(s) and gasket(s with 1/4"-20 x 3/4"
bolts as shown.
4. Wire right side blower first (See wiring diagram)
and replace cover on junction box on blower.
5. Wire left blower same as above and replace
cover.
SMOKE CURTAIN
Using two 1/4-20 x 1-1/4”
Carriage bolts, two smoke curtain
clips, and two nuts, attach the
smoke curtain in place above
the fuel feed door as shown. After
installation, the smoke curtain
should swing freely back into the
furnace.
DOOR LATCH INSTALLATION
With two 1/4-20 x 3/4 hex bolts each, attach the door latch to the door latch mounting
brackets on the left side of the door frame as illustrated. The slots in the brackets and
latches are for door seal adjustment. Make the proper adjustments, then tighten the
nuts. The door’s gasket should be snug against the door frame on the furnace.
Summary of Contents for Clayton CL1660E
Page 9: ...9 INSTALLATION ADD ON INSTALLATION...
Page 27: ...27...