background image

5

Operation of the Heater

BE SURE TO PUT A LAYER OF SAND OR FIREBRICK
APPROXIMATELY 1 1/2" THICK IN THE BOTTOM OF THE
STOVE BEFORE STARTING FIRE.
Burn wood or wood products only. The  wood should be air
dried for at least six months prior to use for maximum effi-
ciency.
After the fire has been started and is burning satisfactorily,
adjust the rate of burning by opening or closing the draft
damper wheel on the feed door.
Never build extremely large fires in this type of heater as
damage to the heater or smoking may result.
Provide air into the room for combustion.
Do Not touch the heater after firing until it has cooled.
Do Not use a grate or elevate fire, build fire directly on hearth.
The fuel feed door must remain closed during operation.

1.

2.

3.

4.

5.
6.
7.
8.

FIG. 7

FIG. 5

FIG. 6

WRONG

WRONG

RIGHT

FLOOR REGULATOR

PIPE

ELBOW

BAROMETRIC
DRAFT REGULATOR

PIPE

COLLAR

THIMBLE

NON-COMBUSTIBLE WALL

FLUE CONNECTION-NON-COMBUSTIBLE WALL

CHIMNEY CAP MANDATORY

3 FT. MIN.

FLOOR PROTECTOR

BAROMETRIC
DRAFT REGULATOR

PIPE

11 FT. MINIMUM

PIPE REDUCER

10 FT.

2 FT. MIN.

NON-COMBUSTIBLE
CONSTRUCTON IN
ACCORDANCE WITH
NFPA 211

Crimped end of the pipe must be installed toward the heater.
The pipe should slide into the flue collar. The pipe should be
firmly attached to the flue collar with 3 screws and sealed with
furnace cement.
Slope any horizontal pipe upward toward the chimney at least
1/4 " inch for each foot of horizontal run.
You must have at least 18" inches clearance between any
horizontal piping and the ceiling. (Fig. 4)
The pipe cannot extend into the chimney flue.(Fig. 8)
Seal each connector pipe joint with furnace cement. Also seal
the pipe at the chimney.
Use 3 sheet metal screws at each joint to make the piping rigid.
It is recommended that no more than two (2) 90 degree bends
be used in the stove pipe installation as more than two (2) may
decrease the amount of draw and possibly cause smoke
spillage.

1.

2.

3.

4.
5.

6.
7.

NOTE:  The chimney connector shall not pass through an
attic, roof space, floor, ceiling, or similar concealed space.
Where passage through a wall or partition of combustible
construction is desired, the installation must conform with
NFPA 211.

Chimney Connection

MASONRY CHIMNEY
The masonry chimney must comply with UL codes.  Before using
an existing masonry chimney, clean the chimney and inspect the
flue liner to be sure it is safe to use. Make repairs before attaching
the heater. See Page 3, Item 5.  Look at Fig. 6. The connector pipe
and fittings you will need to connect directly to a masonry chimney
are shown.  If the connector pipe must go through a combustible
wall before entering the masonry chimney, consult a qualified
masonor chimney dealer. The installation must conform to local fire
codes.  Do not connect this heater into the same chimney flue as
the fireplace or flue from another heater.
The chimney used for a heater must not be used to ventilate the
cellar or basement. If there is a cleanout opening at the base of the
chimney, close it tightly.

UL LISTED CHIMNEY
Carefully follow chimney manufacturer's instructions. Use only listed
type HT per UL 103, 6-in diameter black or blued chimney connector,
minimum 24 gauge steel. If your chimney starts at the ceiling (Fig. 7),
you will need enough 6" pipe to reach the ceiling.
The top of the chimney must be at least 3 feet above the roof and be
at least 2 feet higher than any point of the roof within 10 feet. (Fig 6)

RULES FOR CONNECTOR PIPE INSTALLATION

Summary of Contents for LOGWOOD 2421

Page 1: ...O OBTAIN EFFICIENT DEPENDABLE SERVICE FROM THE HEATER AND ENABLE YOU TO ORDER REPAIR PARTS CORRECTLY KEEP IN A SAFE PLACE FOR FUTURE REFERENCE UNITED STATES STOVE COMPANY 227 Industrial Park Road P O Box 151 South Pittsburg TN 37380 423 837 2100 COMPANY U NITED STATES STOV E C S S U 851094D Owners Manual Owners Manual Owners Manual Owners Manual Owners Manual Logwood 2421 EPA EXEMPT PER METHOD 28A...

Page 2: ... or Electric Drill Bit 1 8 Dia For Sheet Metal Screws Adjustable Wrench Screw Driver Blade Type Gloves Safety Glasses MATERIALS 6 Elbow Collar and Thimble As Required 24 gauge min 1 2 Sheet Metal Screws No 10A x 1 2 6 Diameter 24 gauge black or blued steel Underwriters Laboratories UL Listed Residential Type HT 2100 F Chimney or use a Masonry Chimney in goor repair Floor Protector Material R value...

Page 3: ...one to use this heater who is unfamiliar with the correct opera tion of the heater 1 2 3 4 5 6 7 8 9 10 11 12 13 14 For further information on using your heater safely obtain a copy of the National Fire Pro tection Association NFPA publication Using Coal and Wood Stoves Safely NFPA No HS 10 1978 The address of the NFPA is Batterymarch Park MA 02269 Disposal of Ashes Place ashes in a metal containe...

Page 4: ...er the feed door and secure with screw in slot After consulting the installation instructions for mini mum clearances to combustibles locate your floor protector accordingly and carefully place the stove in your selected location Install stove pipe elbows and thimbleasnecessary utilizingeitherarecentlycleaned and inspected masonry chimney properly lined or a UL Listed chimney Insure that the dampe...

Page 5: ... cement Also seal the pipe at the chimney Use 3 sheet metal screws at each joint to make the piping rigid It is recommended that no more than two 2 90 degree bends be used in the stove pipe installation as more than two 2 may decrease the amount of draw and possibly cause smoke spillage 1 2 3 4 5 6 7 NOTE The chimney connector shall not pass through an attic roof space floor ceiling or similar con...

Page 6: ...e connected to a masonry chimney by passing through a combustible wall NFPA Standard 211 allows the following wall pass through systems MASONRY CHIMNEY CONSTRUCTED TO NFPA 211 AIRTIGHT CLEANOUT DOOR FLOOR PROTECTOR COMBUSTIBLE WALL TO HEATER CHIMNEY CONNECTOR CEILING SEE PARTS A B C D AND E OF THIS FIGURE FOR OPTIONS CHIMNEY FLUE FIGURE 8 CONNECTION OF CHIMNEY CONNECTOR TO A MASONRY CHIMNEY THROUG...

Page 7: ... by means of sheet steel support plates on both ends of the chimney section The opening in the combustible wall shall be covered and the chimney section supported on both sides with sheet steel supports which are at least 24 gauge 0 024 in thickness The sheet steel supports shall be securely fastened to wall surfaces on all sides and shall be sized to fit and hold the chimney section Fasteners use...

Page 8: ...NIMUM FACTORY BUILT CHIMNEY LENGHT SHEET STEEL SUPPORTS CHIMNEY SECTION CHIMNEY CONNECTOR AIR SPACE 2 IN TWO VENTILATED AIR CHANNELS EACH 1 INCH CONSTRUCED OF SHEET STEEL PART C FIGURE 8 PART D FIGURE 8 MASONRY CHIMNEY CONSTRUCTED TO NFPA 211 SHEET STEEL SUPPORTS 24 GAUGE MIN THICKNESS CHIMNEY CONNECTOR TO HEATER MINIMUM CHIMNEY CLEARANCES FROM MASONRY TO SHEET STEEL SUPPORTS AND COMBUSTIBLES 2 IN...

Page 9: ...ralargequantity of coarse salt baking soda or cool ashes on top of the fire in the firebox CAUTION A chimney fire may cause ignition of wall studs or rafters which you thought were a safe distance from the chimney If you have a chimney fire have your chimney inspected by a qualified person before using again Service Hints Do not expect a heater to draw It is the chimney that creates the draft Smok...

Page 10: ...327 40329 40330 40331 40332 D6 83427 40334 89971 89972 89973 89974 89975 851094 DESCRIPTION REAR LEG FRONT LEG MAIN BOTTOM MAIN SIDE MAIN BACK HEARTH PLATE SLIDING DRAFT PLATE DOOR FRAME DOOR MAIN TOP LID LID SUPPORT LID LIFTER FLUE COLLAR SOLID FLUE DAMPER DOOR PINS DRAFT CONTROL KNOB HANDLE LATCH NUTS HANDLE EXTENSION HANDLE BRACKET OWNERS MANUAL QNTY 2 2 1 2 1 1 1 1 1 1 2 1 1 1 1 2 1 1 1 2 1 1 ...

Page 11: ...NOTES 11 ...

Page 12: ...EN WRITING ALWAYS GIVE THE FULL MODEL NUMBER WHICH IS ON THE NAMEPLATE ATTACHED TO THE BACK OF THE HEATER WHEN ORDERING REPAIR PARTS ALWAYS GIVE THE FOLLOWING INFORMATION AS SHOWN IN THIS LIST 1 The PART NUMBER 2 The PART DESCRIPTION 3 The MODEL NUMBER 2421 4 The SERIAL NUMBER UNITED STATES STOVE COMPANY 227 Industrial Park Road P O Box 151 South Pittsburg TN 37380 423 837 2100 www USSTOVE com ...

Reviews: