background image

-

9

-

Venting Into A Fireplace

Many people may wish to convert an existing fireplace to heater use. Usually, safe connection of stovepipe to 

a masonry chimney requires more effort than connection to a prefabricated chimney. The fireplace must be 

closed and sealed at the damper in the flue. Good sealants are high temperature caulking, ceramic wool, and 

furnace cement. Always remember to inspect the masonry chimney and fireplace. If necessary, clean the flue 

and smoke shelf before beginning your installation. Install the heater into the chimney so that the system can be 

dismantled for cleaning and inspection.

Before  deciding  to  convert  your  fireplace  or  existing  chimney,  keep  in  mind  that  older  fireplaces  and  their 

chimneys are unsafe. They must be structurally sound, and the flue liner must be in good condition. Do not use a 

chimney if it is unlined (should have a tile clay liner to protect brickwork), have it relined professionally. Clearances 

to combustibles are explained in the previous section on masonry chimneys. If you have any questions regarding 

the  condition  of  the  chimney,  consult  a  qualified  engineer,  competent  mason,  certified  Chimney  Sweep,  or 

knowledgeable inspector.

Many prefabricated fireplaces fall into the “zero-clearance fireplace” category. This is a factory metal fireplace 

with multi-layered construction. It is designed to provide enough insulation and/or air cooling so that the base, 

back  and  sides  can  be  safely  placed  in  close  contact  with  combustible  floors  and  walls.  Although  many 

prefabricated  fireplaces  have  been  tested  by  nationally  recognized  organizations  for  use  as  fireplaces,  they 

have not been tested to accept heaters. In fact, their use as such may void the manufacturer’s warranty.

Steel-lined fireplaces, on the other hand, can be used with heaters. These units use a 1/4-inch fire box liner and 

an air chamber in connection with 8 inches of masonry to meet code. They contain all the essential parts of a 

fireplace, firebox, damper, throat, smoke shelf, and smoke chamber. Many of them look exactly like a masonry 

fireplace and must be checked closely for above requirements before installing a coal heater into them.

Another method frequently used by some people is to vent the heater directly into the fireplace. This does not 

meet code since the heater is being vented into another appliance - the fireplace. This method should not be 

attempted because combustion products will deposit and build up in the firebox or fireplace. Be certain not to 

install a hazard in you house. You will void your warranty with this installation.

Connection of the stovepipe directly into the existing masonry chimney over the fireplace opening is the only 

approved  method.  This  installation  performs  better,  yielding  easy  to  clean  and  inspect  for  creosote.  Before 

beginning this type of installation plan carefully; a high degree of skill is required to insure safety.

An entry port for the stovepipe must be cut through the chimney with minimum damage to the fire clay liner. 

Some involved measurements may be required to locate the flue liner exactly. Before cutting, take time to mark 

the size and position of the entry port. Position the entry port so that at least 8 inches of the flue liner remains below 

the port.

Keep in mind that wood mantels and combustible trim around the fireplace must have adequate clearances 

from the heater and stovepipe or must be protected in an approved manner. Also, be sure to leave at least 

24” clearance between the top of the stovepipe and the combustible ceiling or other combustibles. Placing 

the center of the entry port 2 feet below the ceiling will insure proper clearance for 6 inch, 8 inch, and 10 inch 

stovepipes. Next, install a fire clay (at least 5/8 in. thick) or metal thimble, being sure that the thimble is flush with 

the inner flue lining.  Secure the thimble in place with refractory mortar. The thimble should be surrounded on all 

sides with 8 inches of brickwork (solid masonry units) or 24 inches of stone.

Install the stovepipe as far as possible into the thimble, but not past the inside of the flue lining.  There should 

be a small air space (approximately 1/2 in.) between the stovepipe and thimble, allowing for expansion of the 

stovepipe. Seal this airspace with high-temperature caulking or ceramic wool. Finally, be sure to wire the damper 

closed and apply the same sealant you used at the stovepipe and thimble junction.

Do not vent up through the fireplace opening, regardless of whether the fireplace opening is closed.

Summary of Contents for VOGELZANG VG900

Page 1: ...nspection requirements in your area ASSEMBLY INSTALLATION OPERATION REPAIR PARTS Conforms To UL STD 1482 ULC STD S627 852083B 0703G United States Stove Company 227 Industrial Park Rd Pittsburg TN 3738...

Page 2: ...as necessary 1 2 Sheet Metal Screws 6 Inside Diameter Underwriters Laboratories UL listed Residential Type and Building Heating Appliance Chimney Type HT or 6 existing Masonry Chimney with flue liner...

Page 3: ...s heater Caution do not touch the heater until it has cooled Always wear gloves when refueling this unit or working with metal cabinet parts 10 Keep the ash pit section free of excess ashes Do not all...

Page 4: ...wall ties and furring strips if needed are used to anchor the brick to the wall To avoid excessive heat transmission the spacers or wall ties should not be placed directly behind the heater or chimney...

Page 5: ...45 R Value Have the floor protector extend 16 beyond the door side of the heater and under the connector pipe in the back 3 Check Figures 2 3 and 4 Be sure you have the clearances shown from the heat...

Page 6: ...It is strictly forbidden to use galvanized steel Your smoke pipe should be assembled in such a way that the male section crimped end of the pipe faces down This will allow condensation in the flue to...

Page 7: ...our stove s performance is directly dependent on an adequate draft from your chimney The following recommendations may be useful for the installation of your chimney 1 It must rise above the roof at l...

Page 8: ...nstall the ceiling support package or wall pass through and T section package firestops where needed insulation shield roof flashing chimney cap etc Maintain proper clearance to the structure as recom...

Page 9: ...into them Another method frequently used by some people is to vent the heater directly into the fireplace This does not meet code since the heater is being vented into another appliance the fireplace...

Page 10: ...The inner diameter should never be less than the flue outlet diameter and should never be greater than 50 of the appliance flue outlet For example do not expect a burning stove or furnace to function...

Page 11: ...sociation NFPA by having it inspected by a professional Make sure there are no cracks loose mortar or other signs of deterioration and blockage Have the chimney cleaned before the stove is installed a...

Page 12: ...mm metal chimney connector and a minimum 24 gage ventilated wall thimble which has two air channels of 1 25 4 mm each construct a wall pass through There shall be a minimum 6 152 4 mm separation area...

Page 13: ...SEMBLY NOTICE The CB36 is standard equipment on the model VG900B If you wish to purchase an assembly you can contact your dealer for details or get it directly from the U S Stove Company INSTALLATION...

Page 14: ...ep B 2 Hold the door in that position for approximately 10 seconds 3 Then to open door turn the handle counter clockwise to the 9 o clock position C and then continue to pull the door open D 4 To clos...

Page 15: ...lated gases or smoke to exit into the chimney eliminating flame or smoke spillage into the room 3 If need be shake the grate vigorously back and forth to dump the ashes into the ash pan Do this at lea...

Page 16: ...the center of the firebox forming the cone Burning in this fashion allows heat to drive off the volatile gases and turbulence created increases the burn efficiency There will have to be some experime...

Page 17: ...ur damper and automatic control to the point where the house does not become too cold It is important that you begin banking early enough before retiring or leaving that you can make necessary adjustm...

Page 18: ...any mechanical draft devices and or discharging a CO Carbon Dioxide or Halon fire extinguisher directly into the heater through an appropriately placed cleanout If using a Halon extinguisher please no...

Page 19: ...19 Internal Parts Diagram 6 5 4 24 25 7 8 30 29 27 26 31 32 33 34 30 35 36 34 30 31 20 21 22 23 18 19 13 15 16 17 14 13 3 2 1 11 9 12 10 38 28 37...

Page 20: ...Clip Push 1 13 40100 Liner Front Back 3 14 22536 Support Grate 2 15 40102 Grate Frame 1 16 40101 Grate Coal 1 17 40045 Shaker 1 18 40132 Retainer Brick 2 19 89066 Firebrick 4 5 x 9 x 1 25 10 20 891940...

Page 21: ...83005 10 24 x 1 2 Machine Screw PH HD 2 10 69557B Back Cabinet 1 11 21063 Brace Back 2 12 67966B Top Cabinet 1 13 21593 Support Hinge 1 14 83833 Clip Hinge 1 15 67743 Assy Thermostat 1 16 69271 Chain...

Page 22: ...breach of this written warranty or any implied warranty 2 Should the heater be replaced by United States Stove Company free of charge all further warranty obligations are thereby met 3 Parts and or s...

Page 23: ...23 Notes...

Page 24: ...24 Notes...

Page 25: ...signal tique fix e l int rieur de la porte de l armoire de l appareil de chauffage Lorsque vous commandez des pi ces ou des options de r paration donnez toujours les informations suivantes comme indi...

Page 26: ...rects sp ciaux ou dommages ventuels que quiconque pourrait subir la suite d une violation de cette garantie crite ou de toute garantie implicite 2 Si l appareil de chauffage est remplac gratuitement p...

Page 27: ...m taux 10 24 x 1 2 PH HD 2 10 69557B 69557BR Arri re carter 1 11 21063 Entretoise arri re 2 12 67966B Dessus carter 1 13 21593 Support charni re 1 14 83833 Attache charni re 1 15 67743 Ensemble therm...

Page 28: ...port de grille 2 15 40102 Cadre de grille 1 16 40101 Grille charbon 1 17 40045 Secoueur 1 18 40132 Retenue de briques 2 19 89066 Brique r fractaire 4 5 x 9 x 1 25 10 20 891940 Ensemble de trappe d ali...

Page 29: ...20 Diagramme Des Pi ces Int rieures 6 5 4 24 25 7 8 30 29 27 26 31 32 33 34 30 35 36 34 30 31 20 21 22 23 18 19 13 15 16 17 14 13 3 2 1 11 9 12 10 38 28 37...

Page 30: ...au travers d un porte de ramonage plac e de fa on appropri e Dans le cas de l utilisation de ce deuxi me type d extincteur veuillez noter qu il chasse compl tement l oxyg ne et peut devenir luim me un...

Page 31: ...au charbon aura t bien allum secouez la grille juste un peu et regarnissez DR6 R GULATEUR DE TIRAGE DE 6 KIT OPTIONNEL Dans le cas improbable o votre po le s emballe un tat rendu vident par la couleur...

Page 32: ...harbon de pr f rence des petits morceaux au feu de bois en faisant attention de ne pas le perturber trop ni de couper le tirage Puis ajoutez une deuxi me couche apr s que la premi re ait pris et br le...

Page 33: ...allumage allumez le papier ajoutez des morceaux plus gros de bois dur une fois que le petit bois a bien pris Attention N utilisez jamais d essence de carburant pour lampe p trole du k ros ne de fluid...

Page 34: ...l de chauffage il est possible d ajouter du charbon br ler pour des dur es plus longues de 8 10 heures Mais le faire de mani re n gligente favorisera la combustion incompl te et la suie consid rable a...

Page 35: ...B 2 Maintenez la trappe dans cette position pendant environ 10 secondes 3 Puis pour ouvrir la trappe tournez la poign e en sens antihoraire jusqu en position 9 heures C et continuez de tirer la trappe...

Page 36: ...Si vous souhaitez acheter un ensemble vous pouvez contacter votre revendeur pour les d tails ou l obtenir directement depuis la fabricant de l appareil INSTALLATION 1 Enlevez le panneau A en utilisan...

Page 37: ...e p n trent pas dans le rev tement du conduit de fum e de chemin e M thode D cartement de 2 5 1 cm par rapport une partie murale combustible Commencez avec une section de chemin e d usine homologu e S...

Page 38: ...ttoyer la chemin e avant d installer le po le et le faire fonctionner Pour connecter le po le au travers d un mur combustible vers une chemin e en ma onnerie des m thodes sp ciales sont n cessaires Ch...

Page 39: ...tre interne ne doit jamais tre inf rieur celui de la sortie de fum e de l appareil mais jamais plus grand que 50 de plus que lui Par exemple ne vous attendez pas ce qu un une chaudi re fonctionne corr...

Page 40: ...s pour les exigences pr c dentes avant d installer un po le dedans Une autre m thode fr quemment utilis e par certains est de ventiler le po le directement dans le foyer Cela n est pas conforme la nor...

Page 41: ...olin Quand une chemin e m tallique pr fabriqu e est utilis e les instructions d installation de son fabricant doivent tre suivies Vous devez aussi acheter chez le m me fabricant et installer l ensembl...

Page 42: ...performance de votre po le d pend directement d un bon tirage de votre chemin e Les recommandations suivantes peuvent tre utiles pour l installation de votre chemin e 1 La chemin e doit sortir au des...

Page 43: ...s Votre tuyau de po le doit tre mont de fa on ce que sa section m le extr mit bord rabattu soit orient e vers le bas Cela permettra la condensation de la fum e de revenir dans le po le Fixez ensemble...

Page 44: ...fage et sous le tuyau de connecteur l arri re 3 V rifiez sur les figures 2 3 et 4 Assurez vous de bien avoir les cartements montr s depuis le chauffage et le tuyau de connecteur jusqu aux surfaces com...

Page 45: ...e pour ancrer la brique la cloison Pour viter une transmission excessive de chaleur les entretoises ou les attaches murales ne doivent pas tre plac es directement derri re le chauffage ou le connecteu...

Page 46: ...GANTS QUAND VOUS REGARNISSEZ L UNIT EN CARBURANT OU QUE VOUS MANIPULEZ DES PI CES M TALLIQUES DU CARTER 10 Maintenez la partie du puits cendres sans exc s de cendre Ne laissez pas les centres s entass...

Page 47: ...2 Chemin e de diam tre int rieur 6 15 cm list e UL Underwriters Laboratories pour appareil de chauffage pour r sidence et b timent type HT ou chemin e existante en ma onnerie avec un tubage de chemin...

Page 48: ...s curit propos des restrictions et des exigences d inspection en vigueur dans votre r gion MONTAGE INSTALLATION FONCTIONNEMENT PI CES DE RECHANGE Test s pour la conformit avec UL 1482 et ULC S627 Unit...

Reviews: