Page | 5
1.0 Receiving Equipment
1.1 Inspection
Upon receipt of the Centrifugal Barrel System with integrated Computerized Process Controller (CPC),
please perform a thorough inspection of the shipment. Compare what is received to the packing list
to be sure all the components, including any ordered supplies are present. Check for any damage to
the equipment. If damage is found, notify the delivering freight company and UNITED SURFACE
SOLUTIONS, LLC immediately.
1.2 Selecting Equipment Location
The equipment should be conveniently located to the “flow of parts.” The CPC System will require the
appropriate electrical power, an air-line with a minimum of 100 psi, a water supply with a minimum of
20 psi, and a drain located near the machine. If a sump system and water recycling unit is to be used,
separate power must be provided for those units as well. It is suggested to leave at least three (3) feet
on each side of the machine for maintenance purposes. Sufficient work and storage space is also
required.
2.0 System Dimensions
Height
121”
Width
125”
Depth
78”
Approx.
Weight
7000lbs.