3.0 Equipment Setup
3.1 Isolation Pads
While setting up the CPC, make certain that high-capacity rubber isolation
pads (rated at a min. of 1500 psi) are installed under each leg of the unit.
These pads are used to level the equipment and will extend the service life
of the machine. The leveling procedures will be explained later in this
section.
3.2 Electrical
With the CPC in position, a licensed electrician will be required to connect electrical power. The power
requirements for your new equipment are printed on the data plate, which is located on the upper
left-hand corner of the machines left side panel. Refer to included schematics for setup details.
UNITED SURFACE SOLUTIONS, LLC personnel are not authorized to make connections to your
building’s electrical system. Likewise, non-UNITED SURFACE SOLUTIONS personnel are not authorized
to make any modifications or adjustments to the equipment without written authorization. Doing so
may compromise operator safety as well as your warranty.
Caution: Be sure to connect only the specified voltage to the machine. These systems are built with standard
voltage 460VAC / 60Hz, but can be ordered in 400VAC / 50Hz configuration. Applying improper voltage will result
in severe damage to the system and will void the warranty. Inspect the motor and AC drive to confirm the rated
voltage.
3.3 Leveling
Once the electrical connections have been made, it will be necessary to level the unit. Do not skip this
step of the setup process. This unit uses a fluid mass of media to finish your parts and if the machine
is not level, this fluid mass will favor one side of the barrel, effectively reducing the available working
volume of the barrel. This may result in an increase in part-on-part damage. The following instructions
will aid you in leveling the CPC:
1.
Install High-Capacity Rubber Isolation Pads (rated at 1500 psi) under each leg of the
unit. Recommended pad size is 6” X 6” X ½”.
2.
Turn on the power for the CPC at the disconnect the switch located on the right side of
the machine. The shutter door should open automatically once the Red Beacon stops
flashing and the System Initialization is complete. If the shutter door does not open
please check the incoming air supply.
3.
Select ‘Manual Operation’ from the CPC Touch Screen Interface. Using the Jog controls,
position the cradles so you have access to the center axle of the turret.
4.
Place a magnetic beam level on the center axle of the turret.