Assembling Your ILS System
13
Assembling Your ILS System
Familiarize yourself with the instructions before getting started.
Once the system has been placed in its desired location of operation, it is necessary to properly level the
laser system. Once leveled, install the laser cartridge on the back of the machine and perform a beam
alignment check.
Do not
power up your laser system until the final step, “Checking Beam Alignment.”
CAUTION:
Do not attempt to move or lift this system alone. Obtain assistance from three or four ad-
ditional people when lifting or carrying (secure motion system and doors before lifting). Bodily
injury may occur if improper lifting techniques are used or the system is dropped.
System Unpacking - ILS9.75, ILS9.150D, ILS12.75 and ILS12.150D
Before unpacking the laser system and for servicing reasons, make sure that the system is located in a
place where it can reside at least 3 feet (1 meter) from any wall and 3 feet (1 meter) from any obstruction
to the left and right sides of the laser system.
Summary of Contents for Industrial ILS12.150D
Page 1: ...www ulsinc com Installation Set up Guide ILS9 75 ILS9 150D ILS12 75 ILS12 150D...
Page 2: ......
Page 8: ......
Page 28: ......
Page 32: ...Notes...
Page 33: ...Notes...
Page 35: ......