Maintenance 5-9
Maintenance Schedule
The maintenance requirements of the laser system is dependent on the type of material being run, the
quantity of material being removed, and the hours of operation. As a starting point, we recommend the
following schedule:
•
As necessary
Engraving Table
Main enclosure
Top Door Window
•
Every 8 hours of engraving
Clean X-axis and Y-axis Bearings
Clean X-axis and Y-axis Rails
Clean X-axis Belt
Check Beam Window, #2 Mirror, #3 Mirror, and Focus Lens for contamination - clean only if dirty)
Check Pre-Filter for saturation - clean or replace if necessary
•
Every month
Clean Cooling Fan filters
Clean and re-lubricate Z-axis Lead screws
Check for X-axis and Y-axis Belt wear – replace as necessary
Check and/or clean X-axis and Y-axis Drive Gears
Check for X-axis and Y-axis Bearing wear – replace as necessary
Inspect system for loose screws and mechanical parts – tighten if necessary
•
Every 6 months
Exhaust Plenum
•
When prompted by the software
Clean and/or replace Pre-Filter
Replace Main Filter
Replace Vacuum Motor
If you are noticing a considerable buildup of debris on the optics and the motion system, clean the system
at more frequent intervals. If your system has remained relatively clean, you can extend your cleaning
intervals. You need to be the judge but keep in mind that a clean machine is a better performing machine
and can extend the life of the parts as well as reduce the possibility of down time. If you have any
questions about maintaining the laser system, please contact our Service Department.
Summary of Contents for LaserKiosk
Page 34: ...APPENDIX...