Step 3: Assembling and Connecting Your Laser System
Familiarize yourself with the instructions before getting started.
The final step in installation is to assemble your laser system, install the laser cartridge, make final connections
and perform a beam alignment check. Do not power up your laser system until the final step, “Checking Beam
Alignment.”
Exhaust Air Filtration Unit Assembly (Optional)
1.
Unpack the air filtration unit and place it on a level surface.
2.
Push down on the tabs of the locking casters so that the cart does not roll.
3.
Unpack the laser system.
4.
With the assistance of another person, lift the laser system and place it on top of the air
filtration unit so that the feet of the laser system rest within the four depressions on top of
the air filtration unit.
26
Summary of Contents for VLS2.30
Page 1: ...VLS Desktop User Guide VLS2 30 VLS3 50 www ulsinc com Revision 2012 08...
Page 5: ...Chapter 1 Specifications 5...
Page 8: ...Chapter 2 Safety 8...
Page 9: ......
Page 15: ......
Page 16: ......
Page 19: ...Chapter 3 Installation 19...
Page 36: ...Chapter 4 Operation 36...
Page 62: ......
Page 68: ...Chapter 5 Accessories 68...
Page 80: ...Example Connection for PNP mode Example Connection for NPN mode 80...
Page 92: ...Chapter 6 Maintenance 92...
Page 99: ...www ulsinc com...