Supporting plate
CD0000284
In-wall cabinet with supporting plate for dry construction. The
supporting plate is mounted from the front and can later be covered
with plasterboard.
5.2 On-wall installation
Note
For disassembling the on-floor cabinet, leave
3 cm
space
above and to the sides.
The on-wall mounted cabinets are equipped with venting systems to
prevent unnecessary build-up of heat and condensation.
Assembling the on-wall connection rail
A
SI0000276
Item
Description
A
Plug (6 pcs)
1.
Mark the hole positions on the wall and drill holes using a
6 mm
drill.
2.
Insert the plug in the drilled holes.
Note
See the dimensional drawings for measurements. Pay
attention to the horizontal alignment.
3.
Attach the on-wall rail to the wall using the hexagon bolts.
SI0000277
A
Item
Description
A
Hexagon bolt (2 pcs)
4.
Install all pipes to the on-wall rail connections.
Install the heat interface unit
SI0000278
A
B
C
Item
Description
A
Heat interface unit
B
Connection rail
C
Flat gasket
1.
Screw the heat interface unit to the wall using the hexagon bolts
2.
Place the flat seals on to the connection rail
¾"
screw
connection.
Note
Check the flat seals for damage.
3.
Tighten the
¾"
swivel nuts.
Combi Port Base
|
Installation and operation manual
|
13