2 Preface
The manual shows an example of an Combi Port Base connection
variant. Information about other variations, as well as further technical
data can be found in the "Combi Port Base Technical Information".
This installation and operation manual describes how to install and
operate the components of the system.
2.1 Safety instructions
Warnings used in this manual
The following symbols are used in Uponor documentation to indicate
special precautions when installing and operating any Uponor
equipment:
Warning!
Risk of injury. Ignoring warnings can cause injury or
damage components.
Caution!
Ignoring cautions can cause malfunctions.
Note
Important information to the section in the manual.
Power
Warning!
Risk of electric shock if touching the components! The
unit operates with a 230 V AC voltage.
Warning!
Risk of electrical shock! Electrical installation and service
behind secured 230 V AC covers must be carried out
under the supervision of a qualified electrician.
Warning!
The Uponor system uses 50 Hz, 230 V AC power. In
case of emergency, immediately disconnect the power.
Warning!
Prior to any work on the controller or the components
connected to it, switch off the controller according to the
regulations.
Technical constraints
Caution!
To avoid interference, keep installation/data cables away
from power cables of more than 50 V.
Safety measures
Conform to the following measures when installing and operating any
Uponor equipment:
•
Read and follow the instructions in the installation and operation
manual.
•
Installation must be performed by a competent person in
accordance with local regulations.
•
It is prohibited to make changes or modifications not specified in
this manual.
•
All power supplies must be switched off before starting any
wiring work.
•
Do not use water to clean Uponor components.
•
Do not expose the Uponor components to flammable vapours or
gases.
Uponor cannot accept any responsibility for damage or breakdown
that can result from ignoring these instructions.
2.2 Standards and regulations
Note
The installation must be carried out in accordance with
current local standards and regulations!
Planning and designing of the heating system
must be performed
in accordance with applicable global and country-specific standards
and guidelines
•
Ensure that no aggressive substances, such as acids, lubricants,
bleach, flux, strong liquid cleaning agents, contact sprays or
concrete including its components, come into contact with the
stainless steel manifold and manifold components.
•
A water analysis is recommended for each installation. In the
event of warranty claims, it is mandatory. It is essential that the
heating circuits are regulated on the water side so that a
sufficient hydraulic function of the individual heating circuits or
the entire underfloor heating system is guaranteed!
For Combi Ports with an assembled water meter,
planning and
implementation of the drinking water system
must be done in
accordance with the Infection Protection Ordinance.
A few points to be high-lighted:
•
Flush and disinfect the system before commissioning and
handing over to the user.
•
Provide the domestic hot water pipes with required thermal
insulation strength.
•
Insulate the drinking cold water pipes to secure that no heating
in excess of the requirements takes place.
2.3 Correct disposal of this
product (Waste Electrical and
Electronic equipment)
Note
Applicable in the European Union and other European
countries with separate collection systems
This marking shown on the product or its literature indicates
that it should not be disposed with other household wasted at the end
of its working life. To prevent possible harm to the environment or
human health from uncontrolled waste disposal, please separate this
from other types of wastes and recycle it responsibly to promote the
sustainable reuse of material resources.
4
|
Combi Port Base
|
Installation and operation manual