10 l Uponor Comfort Port EU l Technical Information
EN
3.1 Design requirements
3.2 Installation
3 Installation and Operation
Installation Comfort Port
(example: In-wall version)
The Uponor Comfort Port is delivered pre-assembled ready for
connection to the construction site. There it can be used directly in
the on-site wall niche.
Below are some basic steps briefly described. Detailed assembly
and operating instructions for the components you will find in each
Comfort Port packaging.
The comfort ports are already quipped with two spirit levels built into
the cabinets for easy leveling without additional tools for horizontal
and vertical leveling.
1.
The preassembled Uponor Comfort Ports are used to distribute the
heating water into the heating circuits of a floor heating system.
Uponor stainless steel distributors may not be used in drinking water
systems or sanitary installations.
The manufacturer is not liable for any damage resulting from
improper use of the Uponor Comfort Ports.
2
. Check the stations for completeness prior to installation; any loose
or loosened screws due to transport should be retightened.
3.
Conversion or modification to the Uponor Comfort Ports is only
permitted upon agreement with Uponor.
4.
Never remove any part of the Uponor Manifold or other hydraulic
components when the system is under pressure. Serious injuries could
be the result.
5.
Required electrical connections, work for installation,
commissioning and maintenance must only be carried out by qualified
specialist personnel.
6.
The heating system must be planned and constructed according to
the recognized rules of technology as well as current DIN standards
and VDI guidelines. The applicable and comparable country-specific
regulations or standards must be observed.
7.
The heating water used must comply with the requirements of VDI
2035. In the case of warranty claims, a water analysis is mandatory.
8.
In order to ensure the hydraulic function of the individual heating
circuits or the entire underfloor heating system, the individual heating
circuits must be hydraulically regulated.
9.
Prior to any work on the control module or the components
connected to it, the control module must be switched to voltage-free
according to the regulations.
10.
For mounting and hydraulic and electrical connection of the
Uponor Comfort Ports, please refer to the enclosed installation and
operating instructions. Damage caused to the Uponor Comfort Ports
or the heating system or the building as a result of an infringement
will void our warranty.
11.
Properly instruct the user of the system in the operation of the
system and hand over this technical information together with the
inventory documents.
If you have questions regarding the application or operation of
Uponor products, please contact your Uponor contact person or
contact our Technical Hotline directly.
Technical Hotline Uponor: (put unit specific call number)