5.4 Connect the controller to AC power
To conclude the installation of the controller:
Warning!
Electrical installation and service behind
secured 230 V AC covers must be carried
out under the supervision of a qualified
electrician.
1. Check that all wiring is complete and correct:
•
Actuator
• Heating/cooling switch
2. Connect power to the controller according to the
illustration below.
L
230 V AC 50 Hz
N
3. Ensure that the 230 V AC compartment of the
controller is closed and the fixing screw is tightened.
4. Connect the power cable to a 230 V AC wall socket,
or if required by local regulations, to a junction box.
5.7 Test actuators
The controller manages the temperature setpoint. When
a temperature change occurs, the actuator opens or
closes the valve to adjust the room temperature.
To test the actuators:
1. Increase the setpoint on the thermostat to the
maximum setting.
The acutator should start opening and the LED, for
relay 1, on the controller lights up, wait until fully
opened.
2. Decrease the setpoint on the thermostat to the
minimum setting.
The acutator should start closing and the LED, for
relay 1, on the controller shuts off, wait until fully
closed.
3. Reset the setpoint to default values.
The Uponor Smatrix Space controller is designed to be
used with Uponor 230 V normally closed actuators.
UK
CZ
DE
DK
EE
ES
FI
FR
HR
HU
IT
LT
LV
NL
NO
PL
PT
RO
RU
SE
SK
1 4
U P O N O R S M AT R I X S PA C E / S PA C E P L U S · I N S TA L L AT I O N A N D O P E R AT I O N M A N U A L