A permanent capacitor, impedance protected motor (no start
switch) on the circulator is required. The maximum allowable
amperage for this output is 2.2 amps, which limits the
allowable circulator size to 1/6 HP.
This type of system can use a small circulator to inject a high
BTU input into a relatively large system flow. Typically, the
injection pump need only deliver 1/6 to 1/4 of the system flow
for low temperature radiant panels if high temperature water
is available for injection. In small hydronic systems, the
smallest available circulator for variable speed injection may
be too large. It is important to properly size the injection pump
and use a globe valve on the return injection leg.
For proper injection pump sizing, the designer must know the
following information:
(See fig. b)
F
V
= Flow Rate (Injection Loop) in GPM
F
1
= Radiant (Secondary Loop) Flow Rate in GPM
T
1
= Boiler (Primary Loop) Supply Temperature
T
2
= Radiant (Secondary Loop) Supply Temperature
T
R
= Radiant (Secondary Loop) Return Temperature
T
D
= Radiant (Secondary Loop) Temperature
Differential (
T
2
-
T
R
)
Note:
All values are to be given at design
conditions. The formula used for sizing the
injection pump is shown below.
F
V
= (
F
1
x
T
D
)
/
(
T
1
-
T
R
)
Example:
If values at design conditions are:
F
1
= Radiant (Secondary) Flow = 30 GPM
T
1
= Boiler (Primary) Supply = 180°F
T
2
= Radiant (Secondary) Supply = 140°F
T
R
= Radiant (Secondary) Return = 120°F
T
D
= Radiant (Secondary) Differential = 20°F
To find the injection pump flow rate:
F
V
= (30 x 20)
/
(180 - 120)
F
V
= (600)
/
(60)
F
V
= 10 GPM
APPENDIX I
APPENDIX I - Variable Speed Injection Mixing
b
Direct Injection Mixing
“F
V
” to be calculated
Variable
Speed
Injection
Pump
Supply To LOW
Temperature Loop
T
2
F
1
Supply From HIGH
Temperature Loop
T
1
T
R
F
1
“DIRECT” INJECTION
F
V
F
V
T
D
Direct Injection
F
V
= (
F
1
x
T
D
) / (
T
1
-
T
R
)
Summary of Contents for SYSTEMpro 311
Page 1: ...SYSTEMpro 311 Installation Manual...
Page 90: ...88 APPENDIX II APPENDIX II SYSTEMpro 311 Menu Tree...
Page 91: ...89 APPENDIX II APPENDIX II SYSTEMpro 311 Menu Tree...
Page 92: ...90 APPENDIX III APPENDIX III Application Drawings...
Page 93: ...91 APPENDIX III APPENDIX III Application Drawings...
Page 94: ...92 APPENDIX III APPENDIX III Application Drawings...
Page 95: ...93 APPENDIX III APPENDIX III Application Drawings...
Page 96: ...94 APPENDIX III APPENDIX III Application Drawings...
Page 97: ...95 APPENDIX III APPENDIX III Application Drawings...
Page 98: ...96 APPENDIX III APPENDIX III Application Drawings...
Page 99: ...97 APPENDIX III APPENDIX III Application Drawings...
Page 106: ......