Treatment plant discharge and 
overfl ow must be arranged so that no 
backfl ow to the treatment plant can 
occur. The overfl ow pipe ensures that 
water cannot rise to the treatment 
plant machine room. The pipes to be 
joined are insulated if necessary, and 
the pipe is slanted enough to prevent 
water remaining in it (min. 1cm/m). 

NOTE! Ensure the discharge location 

does not freeze during winter! 

2.3.5 Assembling of ventilation 
pipe and signal lamp

• 

Install the single branch in the 
lower part of the ventilation 
pipe.

• 

Pass the electrical cable of the 
signal lamp trough the ventila-
tion pipe.

• 

Attach the signal lamp at the 
end of the ventilation pipe and 
lock it with a screw 
(picture 22b).

• 

Install the ventilation pipe in 
place and pass the cable to the 
machine room.

• 

Connect the signal lamp plug 
into the X7 socket.

2.3.6 Electrical connections  

Electricity is connected to the treat-
ment plant as a fi xed land installation 

from the property’s main distribution 
board. The electrical cable is brought 
to the machine room from the electri-
cal pass-through at the back of the 
treatment plant. The cable should 
be installed inside sand or protec-
tive tubing and marked according to 
protection requirements. 

The electricity cable is connected to 
the single-phase socket in the treat-
ment plant machine room. The control 
unit is connected to the socket with 
a plug. 

Treatment plant grounding is done 
through the building’s main distribu-
tion board. 

NOTE! Electrical cable connections 
are to be carried out by a professional 
electrician!

Electrical connections from the 
property distribution board to 
the treatment plant: 

•  

230V, 

50Hz 

• 

 Distribution board main fuse 
10A 

• 

 Electrical cable e.g. MCMK 2 x 
1.5/1.5, if distance to treatment 
plant is less than 100m

Control unit: 

1

   Main circuit breaker Q1

2

   Main fuse F1 10A

3

   Control fuse F2 2A

4

   Pumps fuse F3 6A

5

   Heater fuse F4 6A

6

   Ground fault switch 

F5 2B 25A 30mA

7

   SIM card installation rail 

for GSM modem (optional)

8

 PLC-HMI

X0

   Storage tank transfer pump P0

X14

 Overfl ow level switch LS4

X3

   Compressor P3

X11

 Storage tank level switch LS1

X6

   Service socket (heater, optional)

X1

   Process tank emptying pump P1

X2

   Chemical pump P2

X4

  Process tank sludge pump P4

X12

  Process tank level switch LS2

X13

  Chemical tank level switch LS3

X7

  Signal lamp H1

XS

  Control unit main plug

Electrical connection X6 is a process 
control independent socket that 
can be temporarily used e.g. during 
service. 

NOTE! Equipment not part of the 
treatment plant must not be con-
nected to control unit!

11

Summary of Contents for WehoPuts 10

Page 1: ...WehoPuts 5 10 MINI AT URE WA S T E WAT E R T R E ATME N T PL A N T S INS TA L L AT ION A ND OPER AT ION M A NUA L 9 2014...

Page 2: ...removal using sludge bags 14 4 Treatment plant management 15 4 1 Treatment plant control unit 15 4 2 Process monitoring 15 4 3 Operation settings 16 4 4 Acknowledging alarms and reminders 17 4 5 GSM r...

Page 3: ...vers structural manufactur ing and material errors reported to and veri ed by the manufacturer Detailed warranty conditions can be found in the warranty certi cate supplied with the treatment plant MO...

Page 4: ...ent plant will automati cally resume the process from the interrupted stage Process steps 1 Wastewater batch accumulation Wastewater is directed into the storage tank without separate pre treatment Fr...

Page 5: ...875 1105 920 1160 outlet 110 110 outlet height from ground level 1335 1400 Electricity 230V 230V Distribution board main fuse 1x10A 1x10A Power supply cable MCMK 2x1 5 1 5 MCMK 2x1 5 1 5 Annual power...

Page 6: ...ank level switch 6 Over ow pipe connection 7 Machine room ventilation 8 Flushing tank 9 Chemical tank 10 Aerating plate 11 Sludge pump 12 Emptying pump 13 Process tank level switch 14 Outlet pipe conn...

Page 7: ...on pipe signal lamp ventilation pipe sludge bags sludge bag xing ring settling test measuring glass 2 2 Planning and choice of treatment plant location A plan is required for wastewater system constru...

Page 8: ...absorption well or area is measured based on the amount of water absorbed at one time and a bypass option is arranged in case of clogging It is preferable to install an inspection pipe in front of the...

Page 9: ...ant in locations where the soil contains mostly clay or high groundwater levels Lower the treatment plant into the trench using the lifting rings Install the anchor plates 4 pcs rod on the rods inside...

Page 10: ...er ow pipe in e g properties with a basement Over ow pipe and discharge pipe connection Fill the trench in layers to the level of the over ow pipe and discharge pipe connection Connect the over ow pip...

Page 11: ...d marked according to protection requirements The electricity cable is connected to the single phase socket in the treat ment plant machine room The control unit is connected to the socket with a plug...

Page 12: ...ting outward from the plant The treatment plant is entirely insulated to ground level 2 3 8 Filling and locking After installation the trench is lled up and the ground is shaped so it is slanted away...

Page 13: ...ere must be no sand or stones on the bottom of the storage and process tanks after installation 3 2 Releasing pumps For transport and installation the treatment plant pumps 2 pcs have been lifted to t...

Page 14: ...mode the compressor aerates the waste water Once a certain amount of wastewater has accumulated in the process tank the cleaning process begins 3 6 Sludge removal using a vacuum truck In the treatment...

Page 15: ...ers or alarms may be moni tored from the control unit PLC display The logic keyboard can be used for the following operational settings and choices Operating language Sludge emptying method selection...

Page 16: ...6 00 No Specifying sampling time The function is activated by choosing Yes and pressing Enter Feed the process block end time in numbers and press Enter The time is speci ed by being 7 h 30 min before...

Page 17: ...s been corrected and the alarm acknowledged The status of the treatment plant may also be supervised by status queries which the plant will reply to using SMS messages Messages correspond to readings...

Page 18: ...ault switches at least once a year The switch is checked by pressing the Test button in the control unit Pressing the button should trigger the fuse which is restored after the test NOTE You can test...

Page 19: ...age tank Sludge bag installation and replacement 1 Open treatment plant lid and move the sludge pipe to the side before removing the sludge basket picture 34 2 Lift up the entire sludge basket 3 Relea...

Page 20: ...ge removal using a vacuum truck is normally performed twice a year Vacuum truck emptying is not the default setting in the treatment plant Sludge pumping into the sludge bag is enabled until vacuum tr...

Page 21: ...tling test 4 Take sludge from the process tank on the right side into the measuring glass up to the one litre marker picture 40 5 Place the measuring glass on an even surface temperature above 0 degre...

Page 22: ...d into the treatment plant as it is a strong alkali that may lead to active sludge death Picture 42 Picture 43 Picture 44 5 5 2 Dosing and monitoring Lime is added into the treatment plant s process t...

Page 23: ...orised service vendors The periodic service and failure related service of the treatment plant are carried out by the manufacturer or a manufacturer authorised ser vice centre The owner of the propert...

Page 24: ...ince the last vacuum truck emptying The sludge bag reminder is not on by default You can activate the reminder by using the instructions in section 4 3 The replacement interval is a guideline When slu...

Page 25: ...nspected If the sludge is black in colour the active sludge has died This may be due to a long break in operation aerating malfunction or foreign substance in the treatment plant You can determine the...

Page 26: ...TE Before service ensure that the electrical supply to the treatment plant is disconnected NOTE Note the risk of falling into the tank 7 2 1 Transfer pump cleaning The transfer pump is located inside...

Page 27: ...ter cleaning ensure the free rotation of the blade wheel picture 53 Picture 48 Picture 49 Picture 50 9 Reassemble the pump after cleaning Carefully reattach the bottom plate screws Clear any accumulat...

Page 28: ...er pump chain in the storage tank The structure of the treatment plant is explained in section 1 7 Cleaning storage tank level switches see section 7 1 items 1 2 6 and 9 Cleaning process tank level sw...

Page 29: ...Operation journal dures carried out on the treatment plant DATE EVENT ALERT SERVICE PROCEDURE The property owner must regularly complete an operation journal of the operation and service proce 29...

Page 30: ...DATE EVENT ALERT SERVICE PROCEDURE 30...

Page 31: ...DATE EVENT ALERT SERVICE PROCEDURE 31...

Page 32: ...30721_ENG_09 2014 Performer Uponor Infra Ltd P O Box 21 FI 65101 Vaasa Finland T 358 20 129 211 F 358 20 129 2098 W www uponor E markkinointi uponor uponor com...

Reviews: