background image

This manual applies to models WehoPuts 5 and 10 (soft ware version 5.X) 

1. WehoPuts miniature wastewater 

treatment plant – general

1.1 General 

The WehoPuts miniature wastewa-
ter treatment plant is a bio-chemical 
domestic wastewater treatment 
system intended for year-round use. 
All wastewater is directed into the 
treatment plant without separate 
pre-treatment. Treated water then 
fl ows or is pumped to the discharge 
point.

Further information on the point 
and manner of discharge must be 
received from the local environmen-
tal authorities before installation.

The WehoPuts treatment plant 
has been designed to suit a certain 
number of persons and quantity of 
wastewater (calculated based on 
150l/person/day).

If household water is taken from a 
private well, its quality must meet 
the general recommendations to 
secure good operation of the treat-
ment plant.

Information on the function of the 
WehoPuts treatment plant is avail-
able from the display in the plant 
control unit and the signal lamp on 
the machine room ventilation pipe.

NOTE! The signal lamp must be 
monitored carefully. When the signal 
lamp is on, the treatment plant is 
functioning normally. When the 
light is fl ashing or has gone out, the 
treatment plant has a malfunction 
and the message on the control unit 
display must be checked immedi-
ately! 

To simplify plant operation 
monitoring, the WehoPuts 5 and 10 
treatment units off er an optional 
GSM modem allowing for treatment 
plant remote monitoring using GSM 
phones. The GSM modem must be 
specifi ed when ordering the treat-
ment plant, as well as the need to 
use more than one GSM phone.

The WehoPuts treatment plants 
have a 2-year warranty starting 
from the purchase date. The war-
ranty covers structural, manufactur-
ing and material errors reported to 
and verifi ed by the manufacturer. 
Detailed warranty conditions can 
be found in the warranty certifi cate 
supplied with the treatment plant.

MODEL

 

MAXIMUM LOAD

m

3

/day

MAXIMUM AMOUNT 

OF PERSONS

WehoPuts 5

0.75

5

WehoPuts 10

1.5

10

Table 1. WehoPuts treatment plant cleaning 
capacity 

1.2 Operational safety

The tank lid must always be care-
fully locked. 

Only the electrical con-
nections and cleaning 
process control proce-

dures specifi ed in the installation 
and operation manual may be 
performed during maintenance.

When fi lling the chemical container 
and handling the chemical pump, 
the corrosiveness of the chemicals 
used (pH 2) must always be taken 
into account. Therefore, special 
protective equipment such as rub-
ber gloves and protective glasses 
must be worn. The safety data 
sheet must be studied in advance. 
The treatment plant is equipped 
with device-specifi c automatic 
fuses and ground fault switches. 
Treatment plant grounding is done 

through the building’s main distri-
bution board.

NOTE! The control box casing may 
only be opened by a professional 
electrician.

1.3 Foreign material and debris 
in wastewater

Normal household wastewater, 
such as domestic water and toilette 
fl ushing water, is directed into the 
treatment plant.

Debris washed down with waste-
water may clog or damage the 
treatment plant pumps and stop 
the entire treatment process. To 
ensure the disturbance-free op-
eration of the plant, the following 
materials and items must not be 
fl ushed down with wastewater: 

• 

bottle caps and other small
metal items 

• cigarette 

butts 

• condoms 

• cotton 

buds 

• cotton 

wads 

• hand 

tissues 

• left over food 
• matches 
• medicine 
• nappies
• oil
• plastics
• petrol
• rubber
• sanitary 

towels

• sand
• snuff 
• soil
• solvents
• tampons
• waste
• 

other material that may clog 
pipes, pumps or the treatment 
plant

NOTE! To prevent the pumps from 
clogging, we recommend fl oor drain 
fi lters.

3

Summary of Contents for WehoPuts 10

Page 1: ...WehoPuts 5 10 MINI AT URE WA S T E WAT E R T R E ATME N T PL A N T S INS TA L L AT ION A ND OPER AT ION M A NUA L 9 2014...

Page 2: ...removal using sludge bags 14 4 Treatment plant management 15 4 1 Treatment plant control unit 15 4 2 Process monitoring 15 4 3 Operation settings 16 4 4 Acknowledging alarms and reminders 17 4 5 GSM r...

Page 3: ...vers structural manufactur ing and material errors reported to and veri ed by the manufacturer Detailed warranty conditions can be found in the warranty certi cate supplied with the treatment plant MO...

Page 4: ...ent plant will automati cally resume the process from the interrupted stage Process steps 1 Wastewater batch accumulation Wastewater is directed into the storage tank without separate pre treatment Fr...

Page 5: ...875 1105 920 1160 outlet 110 110 outlet height from ground level 1335 1400 Electricity 230V 230V Distribution board main fuse 1x10A 1x10A Power supply cable MCMK 2x1 5 1 5 MCMK 2x1 5 1 5 Annual power...

Page 6: ...ank level switch 6 Over ow pipe connection 7 Machine room ventilation 8 Flushing tank 9 Chemical tank 10 Aerating plate 11 Sludge pump 12 Emptying pump 13 Process tank level switch 14 Outlet pipe conn...

Page 7: ...on pipe signal lamp ventilation pipe sludge bags sludge bag xing ring settling test measuring glass 2 2 Planning and choice of treatment plant location A plan is required for wastewater system constru...

Page 8: ...absorption well or area is measured based on the amount of water absorbed at one time and a bypass option is arranged in case of clogging It is preferable to install an inspection pipe in front of the...

Page 9: ...ant in locations where the soil contains mostly clay or high groundwater levels Lower the treatment plant into the trench using the lifting rings Install the anchor plates 4 pcs rod on the rods inside...

Page 10: ...er ow pipe in e g properties with a basement Over ow pipe and discharge pipe connection Fill the trench in layers to the level of the over ow pipe and discharge pipe connection Connect the over ow pip...

Page 11: ...d marked according to protection requirements The electricity cable is connected to the single phase socket in the treat ment plant machine room The control unit is connected to the socket with a plug...

Page 12: ...ting outward from the plant The treatment plant is entirely insulated to ground level 2 3 8 Filling and locking After installation the trench is lled up and the ground is shaped so it is slanted away...

Page 13: ...ere must be no sand or stones on the bottom of the storage and process tanks after installation 3 2 Releasing pumps For transport and installation the treatment plant pumps 2 pcs have been lifted to t...

Page 14: ...mode the compressor aerates the waste water Once a certain amount of wastewater has accumulated in the process tank the cleaning process begins 3 6 Sludge removal using a vacuum truck In the treatment...

Page 15: ...ers or alarms may be moni tored from the control unit PLC display The logic keyboard can be used for the following operational settings and choices Operating language Sludge emptying method selection...

Page 16: ...6 00 No Specifying sampling time The function is activated by choosing Yes and pressing Enter Feed the process block end time in numbers and press Enter The time is speci ed by being 7 h 30 min before...

Page 17: ...s been corrected and the alarm acknowledged The status of the treatment plant may also be supervised by status queries which the plant will reply to using SMS messages Messages correspond to readings...

Page 18: ...ault switches at least once a year The switch is checked by pressing the Test button in the control unit Pressing the button should trigger the fuse which is restored after the test NOTE You can test...

Page 19: ...age tank Sludge bag installation and replacement 1 Open treatment plant lid and move the sludge pipe to the side before removing the sludge basket picture 34 2 Lift up the entire sludge basket 3 Relea...

Page 20: ...ge removal using a vacuum truck is normally performed twice a year Vacuum truck emptying is not the default setting in the treatment plant Sludge pumping into the sludge bag is enabled until vacuum tr...

Page 21: ...tling test 4 Take sludge from the process tank on the right side into the measuring glass up to the one litre marker picture 40 5 Place the measuring glass on an even surface temperature above 0 degre...

Page 22: ...d into the treatment plant as it is a strong alkali that may lead to active sludge death Picture 42 Picture 43 Picture 44 5 5 2 Dosing and monitoring Lime is added into the treatment plant s process t...

Page 23: ...orised service vendors The periodic service and failure related service of the treatment plant are carried out by the manufacturer or a manufacturer authorised ser vice centre The owner of the propert...

Page 24: ...ince the last vacuum truck emptying The sludge bag reminder is not on by default You can activate the reminder by using the instructions in section 4 3 The replacement interval is a guideline When slu...

Page 25: ...nspected If the sludge is black in colour the active sludge has died This may be due to a long break in operation aerating malfunction or foreign substance in the treatment plant You can determine the...

Page 26: ...TE Before service ensure that the electrical supply to the treatment plant is disconnected NOTE Note the risk of falling into the tank 7 2 1 Transfer pump cleaning The transfer pump is located inside...

Page 27: ...ter cleaning ensure the free rotation of the blade wheel picture 53 Picture 48 Picture 49 Picture 50 9 Reassemble the pump after cleaning Carefully reattach the bottom plate screws Clear any accumulat...

Page 28: ...er pump chain in the storage tank The structure of the treatment plant is explained in section 1 7 Cleaning storage tank level switches see section 7 1 items 1 2 6 and 9 Cleaning process tank level sw...

Page 29: ...Operation journal dures carried out on the treatment plant DATE EVENT ALERT SERVICE PROCEDURE The property owner must regularly complete an operation journal of the operation and service proce 29...

Page 30: ...DATE EVENT ALERT SERVICE PROCEDURE 30...

Page 31: ...DATE EVENT ALERT SERVICE PROCEDURE 31...

Page 32: ...30721_ENG_09 2014 Performer Uponor Infra Ltd P O Box 21 FI 65101 Vaasa Finland T 358 20 129 211 F 358 20 129 2098 W www uponor E markkinointi uponor uponor com...

Reviews: