2.2.1 Planning 

Issues to note when planning 

• 

A location is chosen taking 
into account treatment plant 
maintenance (i.e. not inside 
recreational areas) 

• 

Location must not be inside a 
pit gathering surface water 

• 

Determining electrical and 
drain connections and pos-
sible need for pumping. 

• 

Treatment plant discharge and 
overfl ow must be arranged so 
that no backfl ow to the plant 
can occur 

• 

The discharge and overfl ow 
pipes are separately led into 
the discharge location. 

• 

Freezing and ground frost 
damage are prevented using 
insulation if necessary. 

• 

Storm water and irrigation 
water must not be drained 
into the treatment plant. 

• 

The drain is ventilated to the 
roof of the building. 

• 

If necessary, a discharge plug 
is installed to prevent rodents 
from entering the discharge 
pipe. 

• 

Treated water discharge 
location is chosen taking into 
account the local conditions. 

• 

Discharge water may only be 
soaked if the absorption capa-
bility of the soil is suffi

  cient. 

• 

The absorption well or area 
is measured based on the 
amount of water absorbed 
at one time, and a bypass 
option is arranged in case of 
clogging. 

• 

It is preferable to install an 
inspection pipe in front of 
the treatment plant. If the 
discharge pipe is long, an 
inspection pipe should also be 
installed.

NOTE! Ensure discharge and over-
fl ow pipe functionality in winter 
conditions 

2.3 Installation

2.3.1 Before installation 

• 

Before installation, verify that 
the tanks or treatment plant 
equipment have not been 
damaged during transport. 

• 

Remove the anchor package 
from the sides of the plant. 

• 

Take out the parts and sup-
plies packed inside the plant. 

2.3.2 Digging trench 

• 

Pay attention to work safety 
when digging the trench, and 
leave suffi

  cient working room 

around the treatment plant. 

• 

Level and mechanically 
compress the bottom of the 
trench using sand or gravel 
(bedding level min. 150mm). 

• 

Ensure that the bottom of the 
trench is level under the tank 

• 

Make subsurface drains in 
trenches dug inside clay or 
bedrock. 

Overflow pipe 110

Overflow pipe Ø110

Outlet Ø110

Inlet alternative 2

Inlet alternative 1

Overflow pipe 
Ø 110

Overflow pipe Ø110

Outlet Ø110

Inlet alternative 2

Inlet alternative 1

8

Summary of Contents for WehoPuts 10

Page 1: ...WehoPuts 5 10 MINI AT URE WA S T E WAT E R T R E ATME N T PL A N T S INS TA L L AT ION A ND OPER AT ION M A NUA L 9 2014...

Page 2: ...removal using sludge bags 14 4 Treatment plant management 15 4 1 Treatment plant control unit 15 4 2 Process monitoring 15 4 3 Operation settings 16 4 4 Acknowledging alarms and reminders 17 4 5 GSM r...

Page 3: ...vers structural manufactur ing and material errors reported to and veri ed by the manufacturer Detailed warranty conditions can be found in the warranty certi cate supplied with the treatment plant MO...

Page 4: ...ent plant will automati cally resume the process from the interrupted stage Process steps 1 Wastewater batch accumulation Wastewater is directed into the storage tank without separate pre treatment Fr...

Page 5: ...875 1105 920 1160 outlet 110 110 outlet height from ground level 1335 1400 Electricity 230V 230V Distribution board main fuse 1x10A 1x10A Power supply cable MCMK 2x1 5 1 5 MCMK 2x1 5 1 5 Annual power...

Page 6: ...ank level switch 6 Over ow pipe connection 7 Machine room ventilation 8 Flushing tank 9 Chemical tank 10 Aerating plate 11 Sludge pump 12 Emptying pump 13 Process tank level switch 14 Outlet pipe conn...

Page 7: ...on pipe signal lamp ventilation pipe sludge bags sludge bag xing ring settling test measuring glass 2 2 Planning and choice of treatment plant location A plan is required for wastewater system constru...

Page 8: ...absorption well or area is measured based on the amount of water absorbed at one time and a bypass option is arranged in case of clogging It is preferable to install an inspection pipe in front of the...

Page 9: ...ant in locations where the soil contains mostly clay or high groundwater levels Lower the treatment plant into the trench using the lifting rings Install the anchor plates 4 pcs rod on the rods inside...

Page 10: ...er ow pipe in e g properties with a basement Over ow pipe and discharge pipe connection Fill the trench in layers to the level of the over ow pipe and discharge pipe connection Connect the over ow pip...

Page 11: ...d marked according to protection requirements The electricity cable is connected to the single phase socket in the treat ment plant machine room The control unit is connected to the socket with a plug...

Page 12: ...ting outward from the plant The treatment plant is entirely insulated to ground level 2 3 8 Filling and locking After installation the trench is lled up and the ground is shaped so it is slanted away...

Page 13: ...ere must be no sand or stones on the bottom of the storage and process tanks after installation 3 2 Releasing pumps For transport and installation the treatment plant pumps 2 pcs have been lifted to t...

Page 14: ...mode the compressor aerates the waste water Once a certain amount of wastewater has accumulated in the process tank the cleaning process begins 3 6 Sludge removal using a vacuum truck In the treatment...

Page 15: ...ers or alarms may be moni tored from the control unit PLC display The logic keyboard can be used for the following operational settings and choices Operating language Sludge emptying method selection...

Page 16: ...6 00 No Specifying sampling time The function is activated by choosing Yes and pressing Enter Feed the process block end time in numbers and press Enter The time is speci ed by being 7 h 30 min before...

Page 17: ...s been corrected and the alarm acknowledged The status of the treatment plant may also be supervised by status queries which the plant will reply to using SMS messages Messages correspond to readings...

Page 18: ...ault switches at least once a year The switch is checked by pressing the Test button in the control unit Pressing the button should trigger the fuse which is restored after the test NOTE You can test...

Page 19: ...age tank Sludge bag installation and replacement 1 Open treatment plant lid and move the sludge pipe to the side before removing the sludge basket picture 34 2 Lift up the entire sludge basket 3 Relea...

Page 20: ...ge removal using a vacuum truck is normally performed twice a year Vacuum truck emptying is not the default setting in the treatment plant Sludge pumping into the sludge bag is enabled until vacuum tr...

Page 21: ...tling test 4 Take sludge from the process tank on the right side into the measuring glass up to the one litre marker picture 40 5 Place the measuring glass on an even surface temperature above 0 degre...

Page 22: ...d into the treatment plant as it is a strong alkali that may lead to active sludge death Picture 42 Picture 43 Picture 44 5 5 2 Dosing and monitoring Lime is added into the treatment plant s process t...

Page 23: ...orised service vendors The periodic service and failure related service of the treatment plant are carried out by the manufacturer or a manufacturer authorised ser vice centre The owner of the propert...

Page 24: ...ince the last vacuum truck emptying The sludge bag reminder is not on by default You can activate the reminder by using the instructions in section 4 3 The replacement interval is a guideline When slu...

Page 25: ...nspected If the sludge is black in colour the active sludge has died This may be due to a long break in operation aerating malfunction or foreign substance in the treatment plant You can determine the...

Page 26: ...TE Before service ensure that the electrical supply to the treatment plant is disconnected NOTE Note the risk of falling into the tank 7 2 1 Transfer pump cleaning The transfer pump is located inside...

Page 27: ...ter cleaning ensure the free rotation of the blade wheel picture 53 Picture 48 Picture 49 Picture 50 9 Reassemble the pump after cleaning Carefully reattach the bottom plate screws Clear any accumulat...

Page 28: ...er pump chain in the storage tank The structure of the treatment plant is explained in section 1 7 Cleaning storage tank level switches see section 7 1 items 1 2 6 and 9 Cleaning process tank level sw...

Page 29: ...Operation journal dures carried out on the treatment plant DATE EVENT ALERT SERVICE PROCEDURE The property owner must regularly complete an operation journal of the operation and service proce 29...

Page 30: ...DATE EVENT ALERT SERVICE PROCEDURE 30...

Page 31: ...DATE EVENT ALERT SERVICE PROCEDURE 31...

Page 32: ...30721_ENG_09 2014 Performer Uponor Infra Ltd P O Box 21 FI 65101 Vaasa Finland T 358 20 129 211 F 358 20 129 2098 W www uponor E markkinointi uponor uponor com...

Reviews: