Maintenance
Section
4-2
AB38 Work Platform
Steering
Check Steering Cylinder for leaks. 50h/30d
Assembly
Lubricate all pivot pins.
250h/6m
Check Links and Hubs.
250h/6m
Drive
Check for operation.
Daily
Motors
Check for any foreign bodies.
Daily
Check for wear of brushes.
500h/1y
Check that commutator or springs
500h/1y
are undamaged.
Check bearings for operation.
1000h/2y
Platform
Check welds for cracks.
Daily
Deck and
Check condition of floor.
Daily
Guardrails
Check that securing bolts are
Daily
tightened.
Check drop bar on cage entrance. Daily
Slew
Grease slew gear.
10h/7d
System
Check slew motor for leaks and
50h/30d
mounting bolts for proper torque.
Check hardware and fittings for
250h/6m
proper torque.
Slew
Check torque on all bolts, 15 outer 50h/30d
System/
ring and 20 inner ring.
First Post
Retorque to 220 Nm (160 ft. lbs).
Elevating
Inspect for structural cracks.
Daily
Assembly
Check hoses for pinch or rubbing
Daily
points.
Check pivot pins for damage.
50h/30d
Check pivot pin retaining rings.
50h/30d
Check elevating assembly for
250h/6m
bending.
Check component mounting for
250h/6m
proper torque.
Check fasteners for proper torque. 250h/6m
Lift
Check cylinder rod for wear.
50h/30d
Cylinders
Check pivot pin retaining rings.
50h/30d
Grease all fittings as section 4.4.
50h/30d
Chassis
Inspect for structural cracks.
Daily
Assembly
Check hoses for pinch or rubbing
Daily
points.
Entire Unit
Function check Emergency stop
Daily
switches at control boxes.
Perform pre-operation inspection.
Daily
Check for and repair collision
Daily
damage.
Check for peeling, missing or
Daily
unreadable decals. Replace.
Lubricate.
50h/30d
Grease all fittings.
50h/30d
Check for corrosion - Remove and 250h/6m
repaint.
NOTE:
Recommend Bolt Torques are shown in Table 4-3,
Section 4.13
.
Preventative Maintenance Table Key
Interval
Daily
=
each shift or every day
10h/7d
=
every 10 hours or 7 days
50h/30d
=
every 50 hours or 30 days
250h/6m
=
every 250 hours or 6 months
500h/1y
=
every 500 hours or 1 year
1000h/2y =
every 1000 hours or 2 years
Y
=Yes/Acceptable
N
=No/Not Acceptable
R
=Repaired/Acceptable
Preventative Maintenance Report
Signature of Service Engineer
_____________________________
4.1
Battery
Check electrolyte level.
Daily
System
Check battery cable condition.
Daily
Charge batteries.
Daily
Check Charger condition &
operation.
Daily
Check specific gravity.
50h/30d
Clean exterior.
250h/6m
Clean terminals.
250h/6m
Hydraulic
Check oil level.
Daily
Oil
Drain and replace oil.
500h/1y
(ISO #46).
Hydraulic
Wipe clean.
50h/30d
Pump
Check for hose fitting leaks.
50h/30d
Check for leaks at mating surfaces. 50h/30d
Check mounting bolts for proper
50h/30d
torque.
Hydraulic
Check for leaks.
Daily
System
Check hose connections.
50h/30d
Check for exterior wear.
50h/30d
Change filter.
250h/6m
Emer.
Open the emergency lowering
Daily
Hydraulic
valves and check for proper
System
operation.
Control
Check switch operation.
Daily
Cable
Check the exterior of cable for
Daily
pinching, binding or cable wear.
Tyres /
Check for damage.
Daily
Wheels
Check/torque nuts -
50h/30d
Front: 200 Nm (150 ft. lbs)
Rear: 130 Nm (95 ft. lbs)
COMPONENT
INSPECTION OR SERVICES
INTERVAL
Y
N
R
Date : _______________________________
Owner : ______________________________
Model No : ____________________________
V.I.N No : _____________________________
Serial No :____________________________
Serviced By :__________________________
Service Interval :________________________
COMPONENT
INSPECTION OR SERVICES
INTERVAL
Y
N
R
Summary of Contents for AB38
Page 2: ...ii AB38 Work Platform NOTES...
Page 4: ...ii AB38 Work Platform NOTES...
Page 6: ...iv AB38 Work Platform NOTES Foreword...
Page 10: ...Contents Section IV AB38 Work Platform i NOTES...
Page 14: ...Introduction Specifications Section 1 4 AB38 Work Platform NOTES 1 3...
Page 17: ...Machine Preparation Section 2 3 AB38 Work Platform NOTES 2 7...
Page 18: ...Machine Preparation Section 2 4 AB38 Work Platform 2 7 NOTES...
Page 29: ...Operation Section 3 11 AB38 Work Platform NOTES 3 5...
Page 30: ...Operation Section 3 12 AB38 Work Platform NOTES 3 5...
Page 59: ...Maintenance Section 4 29 AB38 Work Platform NOTES 4 21...
Page 60: ...Maintenance Section 4 30 AB38 Work Platform NOTES 4 21...
Page 66: ...Troubleshooting Section 5 6 AB38 Work Platform 5 7 NOTES...
Page 68: ...Schematics Section 6 2 AB38 Work Platform NOTES 6 0...
Page 72: ...Schematics Section 6 6 AB38 Work Platform 6 1 NOTES...
Page 73: ...Electrical Schematic Schematics 6 7 AB38 Work Platform Section 6 1...
Page 74: ...Electrical Schematic Schematics 6 8 AB38 Work Platform Section 6 1 TOP VIEW...
Page 76: ...Schematics Section 6 10 AB38 Work Platform NOTES 6 2...
Page 78: ...Section 6 2 6 12 AB38 Work Platform Schematics NOTES...
Page 81: ...Illustrated Parts Breakdown Section 7 3 AB38 Work Platform 7 2...
Page 83: ...Illustrated Parts Breakdown Section 7 5 AB38 Work Platform 7 2...
Page 85: ...Illustrated Parts Breakdown Section 7 7 AB38 Work Platform 7 2...
Page 87: ...Illustrated Parts Breakdown Section 7 9 AB38 Work Platform 7 2...
Page 89: ...Illustrated Parts Breakdown Section 7 11 AB38 Work Platform 7 2 22...
Page 91: ...Illustrated Parts Breakdown Section 7 13 AB38 Work Platform 7 2...
Page 93: ...Illustrated Parts Breakdown Section 7 15 AB38 Work Platform 7 2...
Page 95: ...Illustrated Parts Breakdown Section 7 17 AB38 Work Platform 7 2...
Page 97: ...Illustrated Parts Breakdown Section 7 19 AB38 Work Platform 7 2...
Page 99: ...Illustrated Parts Breakdown Section 7 21 AB38 Work Platform 7 2...
Page 101: ...Illustrated Parts Breakdown Section 7 23 AB38 Work Platform 7 2...
Page 103: ...Illustrated Parts Breakdown Section 7 25 AB38 Work Platform 7 2...
Page 105: ...Illustrated Parts Breakdown Section 7 27 AB38 Work Platform 7 2...
Page 107: ...Illustrated Parts Breakdown Section 7 29 AB38 Work Platform 7 2...
Page 109: ...Illustrated Parts Breakdown Section 7 31 AB38 Work Platform 7 2...
Page 111: ...Illustrated Parts Breakdown Section 7 33 AB38 Work Platform 7 2...
Page 113: ...Illustrated Parts Breakdown Section 7 35 AB38 Work Platform 7 2...
Page 115: ...Illustrated Parts Breakdown Section 7 37 AB38 Work Platform 7 2...
Page 117: ...Illustrated Parts Breakdown Section 7 39 AB38 Work Platform 7 2...
Page 119: ...Illustrated Parts Breakdown Section 7 41 AB38 Work Platform 7 2 8 9...
Page 121: ...Illustrated Parts Breakdown Section 7 43 AB38 Work Platform 7 2...
Page 123: ...Illustrated Parts Breakdown Section 7 45 AB38 Work Platform 7 2...
Page 125: ...Illustrated Parts Breakdown Section 7 47 AB38 Work Platform 7 2...
Page 127: ...Illustrated Parts Breakdown Section 7 49 AB38 Work Platform 7 2...
Page 131: ...Illustrated Parts Breakdown Section 7 53 AB38 Work Platform 7 2 NOTES...
Page 133: ...Technician s Print AB38 Work Platform Electrical Schematic...