Page 3-24
Maintenance
3.13 - Mast Assembly
TM12 Work Platform - European
3.13 M
AST
A
SSEMBLY
Figure 3-22:
Mast Assembly
R
EMOVAL
1. Remove the chain mounts and lower mast bearings.
2. Remove the can with the hoisting device.
3. Support the next can with the sling and hoisting device.
4. Remove capscrews, washers and locknut securing cylinder rod to the upper cylinder mount.
5. Remove the lower mast bearings.
6. Remove the can with the hoisting device.
7. Support the inner can with the sling and hoisting device.
8. Remove locknuts, washers and carriage bolts securing the can to the Chassis.
9. Remove the can with the hoisting device.
Front
(12)
Rear
(11)
11
Mast Bearings
2
12
10
14
1
9
3
16
8
5
7
6
8
3
4
13
17
15
1
Inner Can
2
Platform Assy(Can)
3
Lift Cylinder
4
Upper Cylinder Mount
5
Retaining Ring
6
Velocity Fuse
7
Adapter
8
Fitting
9
Can #3 Chain Mount
10
Platform Chain Mounts
11
Rear Mast Bearings
12
Front Mast Bearings
13
Inner Pulley
14
Outer Pulley
15
Outer Chain
16. Proximity Switch
17. Bearing (2)
Summary of Contents for TM12
Page 1: ...TM12 ...
Page 10: ...Page VI Table of Contents List of Tables TM12 Work Platform European NOTES ...
Page 60: ...Page 3 34 Maintenance 3 18 Torque Specifications TM12 Work Platform European NOTES ...
Page 74: ...Page 5 6 Schematics 5 3 Hydraulic Tm12 Work Platform European NOTES ...
Page 79: ...Page 6 5 Illustrated Parts Breakdown TM12 Work Platform European NOTES ...
Page 81: ...Page 6 7 Illustrated Parts Breakdown Basic Assembly TM12 Work Platform European ...
Page 88: ...Page 6 14 Illustrated Parts Breakdown Hose Kit TM12 Work Platform European ...
Page 101: ......