Nipple
B
D
E
1of2
Package Contents
Tools
Required:
Flathead
screwdriver,
Phillips
screwdriver,
pliers,
wire
cutters,
wire
strippers,
electrical
tape,
safety
glasses.
Light
Source:
(1)
Medium
Base
Decorative
Filament
60W
bulb
(provided),
Maximum
150W, Alternate
bulb
(1)
CFL Maximum.
Estimated
Assembly
Time:
20-30
minutes
Preparation:
Identify
and
inspect
all
parts
before
beginning
installation.
Check
package
content
list
and
diagrams
below
to
be
sure
all
parts
are
present.
If
any
parts
are
missing
or
damaged,
do
not
attempt
to
assemble,
install,
or
operate
the
fixture.
Contact
customer
service
for
replacement
parts.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
White wire
from supply
White wire
from fixture
Black wire from
supply (or Red)
Black wire
from fixture
Ground wire
from supply
Ground wire
from fixture
Figure 4
STEP 5
Attach Fixture Body to
Post
-
A. Coat the top 1” of the Post with
Clear Silicone Caulk (not supplied)
and position the Post Fitter onto
the Post. Be sure to seat it
completely, aligning the holes in
the Fitter with the 1/16” Pilot Holes
drilled into the Post.
B. Secure the Fixture to Post with (3)
Mounting Screws (A).
Your fixture is now assembled and
ready to use. Enjoy!
A
Mounting Screw
x 3
Post
Post Fitter
Figure 5
Mounting Hole
A
STEP 3
Drill Pilot Holes on Post
-
A. Carefully fit the Post Fitter over the
end of the Post (not supplied),
making sure the Post Fitter is fully
seated.
B. Mark the drill point for the (3)
Mounting Screws, using (3)
Mounting Holes as reference. After
marking hole locations, remove
fixture from post and drill 1/16” pilot
holes for screws.
Figure 3
Post
Post Fitter
Mounting Hole
STEP 4 - Wire Connections
A. Use standard wire connectors (not included) to make all wire
connections. Twist connectors until wires are tightly joined together.
Wrap each connection with approved electrical tape and carefully
stuff all the connected wires into the Outlet Box.
B
Finial
x 1
STEP 1
remove the
Ring from Fixture Body
-
A. Unscrew Lock Ball
and Lock Screw from
Fixture Body to
remove the Ring.
Figure 1
C
Waterproof
Washer
x 1
D
Top
Cap
x 1
E
Outer
Cap
x 1
F
Bracket
x 1
G
Fixture
Body
x 1
H
Shade
x 1
I
Edison
Bulb
x 1
Fixture
Body
Ring
Lock Ball
Lock
Screw
STEP 2
Assembly Shade to
Fixture Body
-
A. This fixture uses Medium Base
Decorative Filament 60W bulb (I),
Maximum 150W. Insert bulb and
screw snugly into place.
B. Place the Shade (H) in to the
Fixture Body (G). Place the Ring,
the Bracket (F) over the Bolt on the
Fixture Body (G) properly, secure
by threading Lock Ball onto the
Bolt, hand tighten until sung.
C. Reinstall Lock Screw onto the
Fixture Body (G).
D. Place Outer Cap (E), Top Cap (C)
and Waterproof Washer (C) onto
the Nipple on the top of Bracket (E),
secure by threading Finial (B) onto
the Nipple. hand tighten until sung.
Figure 2
F
H
G
Ring
Lock
Ball
Lock
Screw
C
www.urbanambiance.com
Installation Instructions:
UQL
10
1
0