13
REVISION 1.0, 1-19-15
MEMBRANE INSTALLATION, REMOVAL AND REPLACEMENT
Installation and replacing membranes in the pressure vessels is an easy process with the proper infor-
mation and tools at hand. Please refer to the following instructions when removing and replacing mem-
brane elements:
WARNING: ALL PRESSURE GAUGES MUST READ ZERO BEFORE PROCEED-
ING. BEFORE ATTEMPTING, DISCONNECT THE POWER FROM THE SYSTEM
AND BLEED ALL WATER PRESSURE FROM THE SYSTEM.
1. Remove the end cap from the right (feed water) side of the membrane housings. This is done by remov-
ing the two half-moon retaining disks using a #5 Allen wrench, the end plug should then freely slide out of
the pressure vessel. The tubing must be disconnected to remove the cap fully.
2. Remove the membrane bag containing the membrane element from the shipping box. The mem-
brane should be contained within a plastic oxygen barrier bag.
NOTE: WEAR GLOVES FOR THE FOLLOWING STEPS TO PROTECT THE MEMBRANE
FROM CONTAMINATION.
3. Cut the bag open as close as possible to the seal at one end of the bag, so the bag may be re-used if nec-
essary.
Summary of Contents for L1-200
Page 1: ...1 REVISION 1 0 1 19 15 US Water Systems 300 GPD Premium Wall Mount Light Commercial RO System...
Page 9: ...9 REVISION 1 0 1 19 15...
Page 10: ...10 REVISION 1 0 1 19 15...
Page 11: ...11 REVISION 1 0 1 19 15...
Page 12: ...12 REVISION 1 0 1 19 15 SYSTEM IDENTIFICATION...
Page 17: ...17 REVISION 1 0 1 19 15 SPECIFICATIONS...
Page 24: ...24 REVISION 1 0 1 19 15 SYSTEM DRAWING...
Page 25: ...25 REVISION 1 0 1 19 15 L1 300 FLOW DIAGRAM...
Page 26: ...26 REVISION 1 0 1 19 15 L1 SERIES ELECTRICAL SCHEMATIC 110V 60HZ...
Page 27: ...27 REVISION 1 0 1 19 15 L1 SERIES ELECTRICAL SCHEMATIC 220V 50HZ...