STE
Loca
that
hook
dama
assur
hot a
pipes
Close
only
line
sink,
Disco
your
Com
hose
of th
Do n
shou
Valv
with
Che
Turn
valv
to al
T
EP 2: Shut
ate the water s
you have ch
king up the sys
age the membr
re you are us
and cold fauc
s underneath
e the cold wa
to assure tha
is drained. If
turn off the m
onnect the fle
sink with
mpression Fee
was connect
e John Guest
Jo
not over tig
uld be secur
ve will allow
hout the use o
eck for Le
n on the cold
e for leaks.
llow adequa
Tappi
t Off the W
shut-off valve
hosen to use
stem to the ho
rane
(See Con
sing the cold
cets. After th
the sink to id
ater valve. Tu
at the line is
f no shut off
main supply a
exible hose f
cold water.
d Valve onto
ted. Re-attach
Compression
hn Guest Compr
ghten. The c
re. The valv
w you to feed
of existing s
eaks
d water supp
Allow the w
te time for p
ing in
Water
e for the cold
for the suppl
ot supply line w
nditions for o
d water line tu
he water is w
dentify the ho
urn on the co
completely sh
f valve is loc
at the entry to
from the valv
. Thread the
o the port whe
h the flexible
n Feed Valve.
ression Feed Valv
compressio
ve on the side
d your Purely
addle valves
ly. Check th
water to run
pressure to b
nto th
water feed lin
ly.
Accidental
will permanen
operation). T
urn on
both th
warm, feel th
ot and cold.
ld water fauc
hut off and th
cated under th
o the house.
ve that suppli
e John Gue
ere the flexib
hose to the to
.
ve
n nuts
e of the Feed
yEZ system
s.
he compressio
n for a minu
build.
e Cold
ne
lly
tly
To
he
he
cet
he
he
es
est
ble
op
d
on
te
STE
Note:
storag
a cap
(1)
top of
(2)
water
STE
Select
design
on the
Tight
tighten
Using
guide
from t
NOTE
an air
local
away
conta
d Wat
P 3: Moun
Do not ta
ge tank. It ha
by the manu
Connect th
f the water sto
Connect th
storage tank.
P 4: Insta
t a location
n of the plum
e drainpipe.
en the bolts
ning.
g the openin
, drill a 1/4"
the saddle and
E: Some stat
r gap faucet
plumbing c
from the ga
mination and
ter Li
nting the T
amper with
as been pres
ufacturers.
he tank ball
orage tank.
he tube from t
lling the D
for the dra
mbing. Positio
Allow adequ
evenly on
ng in the dr
" hole in the
d threads.
Drain Clamp A
tes and provi
. To assure
code. Locate
arbage dispos
d system fou
ine
Tank Ball
the air val
et and screw
valve assem
the RO modul
Drain Clam
ain hole bas
on the drain o
uate space f
both sides. A
rain outlet s
drainpipe. C
Assembly
inces require
compliance c
e the drain c
sal to preven
uling.
V4
o
Valve
lve on the
wed on with
mbly to the
le to the
mp
sed on the
outlet saddle
for drilling.
Avoid over
saddle as a
Clean debris
e the use of
check your
connection
nt potential
ow
Summary of Contents for Purely EZ
Page 2: ......