In
sta
lla
tion
a
nd
Ope
ra
tion
M
anual
US Water 350 & 700 GPD
Light Commercial RO Systems
INSTALLERS: PLEASE READ ALL INSTRUCTIONS BEFORE IN-
STALLING AND USING THIS SYSTEM.
IT IS RECOMMENDED TO WAIT UNTIL THE ENTIRE SYSTEM IS
PRESSURIZED AND RE-CHECK FOR ANY LEAKS BEFORE LEAV- ING
INSTALLATION SITE.
IT IS NORMAL FOR SOME BLACK CARBON FINES TO APPEAR IN
THE WATER WHEN EMPTYING THE FIRST 2 TANKS OF WA- TER.
THE FIRST 2 TANKS OF WATER PRODUCED SHOULD BE EMPTIED
AND NOT USED.
REVISION # 3
REVISION DATE June 4, 2014