11
Mounting Site Review
Review the following items prior to installation and predetermine the solution to any problems
which may exist:
1. Will the unit open the gate by sliding to the left or the right?
Standing on the inside of the property looking out, an operator installed to the left of the drive is a
left hand installation, an operator installed to the right is a right hand installation. See below.
2. How will the chain brackets attach to the gate?
See page 15 Step 3
3. How will the operator be mounted (on a pad or on a post)
See below
4. For AC Charged System -
See page 17 Step 9a
5. For Solar Charged System -
See page 17 Step 9b
6. How will accessory control wiring, if any, be brought to the control box? Knockouts are provided in
operator base plate for conduit connections.
See page 14
7. Have all entrapment areas been identified?
See page 3
Do not mount in areas by automatic sprinklers, or flood prone areas. It is important that the control
board, control devices, and the battery compartment stay dry.
NOTE: Regardless of mounting method, ensure that operator base does not extend into the
driveway area, where damage from traffic could occur.
Right Hand - Left Hand Installation
1
Right Hand Installation
Gate shown in open position
Left Hand Installation
Gate shown in open position
Inside Property
Inside Property
Driveway
Driveway