SECTION 3-1
INSTALLATION
FLOWMAX RO MANUAL REV: B 05/1999
USFilter
United States Filter Corporation
3.0
INSTALLATION
The purpose of this section is to provide general information on installation of new equipment. All
equipment must be installed according to applicable codes. Refer to the Equipment Specification
drawing supplied in the Appendix to ensure there is adequate support and clearance around the RO unit.
Installation of the U.S. Filter MAX RO unit consists of the following steps:
1.
Uncrate and move the unit to the installation site.
2.
Anchor the skid to the foundation.
3.
Install the feed, product and reject plumbing lines.
4.
Connect the electrical high voltage power wiring.
5.
Connect control device wiring.
6.
Connect air supply to solenoid valve.
7.
Install any pre-treatment equipment and interlock to RO unit.
8.
Install any post-treatment equipment and/or storage tank and interlock to RO unit.
3.1 REQUIRED TOOLS AND PARTS
The tools and parts specified in this section are the bare minimum required to install the RO unit at the
site. The use of other tools and parts may be necessary, depending on the location chosen and other
parameters.
Required Tools
Lock-Out/Tag-Out equipment
safety glasses, gloves, earplugs
moving equipment
hammer drill with masonry bit
pipe cutting, bending, gluing equipment
electrical multi-meter
Required Parts
concrete anchor bolts (size determined by local seismic calculations).
plumbing and electrical materials as required
regulated air supply line
automatic valves for auto flush feature
product pressure relief valve
3.2 EQUIPMENT INSTALLATION GUIDELINES