background image

Assembly Manual 

 

Installation and Assembly Manual. 

Step 1. Make sure that the package contains the following items: 

1.

 

transparent PVC awning with “pockets” for the frame; 

2.

 

a fiberglass frame set (7 or 9 pieces depending on the awning model) 

3.

 

anchors with hinges 

4.

 

six corkscrews (10 for LetoTent 650) 

5.

 

six hooked pins 

6.

 

tension rope - 1 piece 

7.

 

self-tapping screws for securing the frame parts. 

Step 2: Decide on the location of the LetoTent. 

Decide where you want to install the LetoTent. Please keep the following in mind: 

a) Choose a flat area, otherwise, the awning won’t close properly. 

b) Determine the location of the awning opening, let's call it the front of the awning. 
Thus, two anchors are on the sides of the structure, and you cannot enter or exit the 
awning in these places. The awning can only be opened and closed in the front or 
behind. 

c) Make sure that there is at least 25 cm of passage around the awning. In the back 
of the awning from the inside, there should be at least 40 cm of free space for folding 
the awning since the awning folds inwards. 

d)  If  possible,  choose  such  place  to  open  the  awning,  where  there  is  the  least 
resistance to the headwind. 

e)  The  length  of  the  attached  tension  rope  is  the  length  required  between  two 
anchors,  this  refers  to  the  distance  between  the  crossbars  of  the  two  anchors  (on 
which the hinges rotate). 

Reviews: