3N0/3NK/3PD/3PG
2-1-12
2-1-5 Mailbox (option)
The mailbox ejects and stacks to specified tray 1 to 7.
Figure 2-1-16 Mailbox
9
4
3
7
8
8
8
1
1
1
8
8
8
7
6
4
3
4
3
4
3
4
3
4
3
4
3
2
2
2
5
10
11
12
13
14
15
1. Paper conveying pulleys
2. Paper conveying rollers
3. Eject pulleys
4. Eject rollers
5. Lower paper entry guide
6. Center paper entry guide
7. Upper paper entry guide
8. Feedshift claws
9. Tray 1
10. Tray 2
11. Tray 3
12. Tray 4
13. Tray 5
14. Tray 6
15. Tray 7
Summary of Contents for AK 740
Page 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Page 4: ...Revision history Revision Date Pages Revised contents ...
Page 5: ...This page is intentionally left blank ...
Page 11: ...This page is intentionally left blank ...
Page 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Page 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Page 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Page 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Page 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Page 170: ...AK 740 Bridge unit Installation Guide ...
Page 172: ...MT 730 B Mail box Installation Guide ...